Deloitte Summit (410 W. Georgia St) | 92m | 23Fl |Completed


Unfortunate, unplanned drainage pipe it seems....

Dec.14 '21, my pics

TGKESH.jpg
 
The lowest cube in the alley has a similar beam jutting out but it's a reflective covering so it's hard to even make out.

F5Tgc0.jpg


Credit: mcminsen
 
Pics by me January 7th:

Georgia St. frontage/lobby cafe at grade with alley:

pc9oTb8.jpg


View through to elevator lobby a few steps down from the lobby cafe level:

drtmWiW.jpg


G00vPzL.jpg


Front door down a small set of stairs from the Georgia St. sidewalk:

ryE2jMS.jpg


Homer frontage.
Set of stairs and low wall along the sidewalk separating the restaurant patio.
Looks like the restaurant level is a few steps down from the elevator lobby level.

pL6aJ6E.jpg


The ground floor is a lot different than the Oct 12, 2017 plans.

 
Last edited:
Anyone know what this round thing on the alley side is going to be? Maybe a torture chamber? :whip2
I thought it was going to be a revolving door.

After almost four years it's nice to get our sidewalks back again.





Jan.13 '22, my pics










 
I thought there was going to be a back entrance through the round thing - I guess not.
Could just be a lounge?
There's a construction tent near there.
There could be a back door there for what I thought would be a cafe in that space.
 
I wonder who authorized a new lamp post in the middle of the sidewalk?
The crosswalk also needs to be made the full width of the sidewalk (like at Richards).

Pics by me today.

AOG3ojs.jpg


At Richards:

EYd6Y3E.jpg
 
I guess there is some limit on the minimum distance from the building causing the location?

Any idea when the occupancy is being planned? I am curious to see this with some green growth on it in the summer.
 


Back
Top