HomeDiagramsDatabaseMapsForumAbout




Haedo BA
Argentina

Status: Built
• 6 highrise buildings
• 6 total structures
• 1 drawn towers

• County: Morón

• Founded: 11 November 1889
• Declared city: 30 November 1964
• Total area: 6 km²
• Elevation: 27 m

• First highrise: 1940 (36 m)
• Tallest highrise: 1972 (43 m)


Building Search  



Building Status Default  • All  • Built  • Under Construction  • On Hold  • Proposed  • Stale Proposal  • Cancelled  • Destroyed  • Vision  • Fantasy

Listing 1 to 6 of 6 buildings
Name|Floors|Status|Year|Drawings
Las Bases 16314built1972(1)
Barrio Güemes - Perón 127813built1977
Barrio Güemes - Güemes 46213built1977
Barrio Güemes - Chutro 44113built1977
Vignes 129513built1986
Hospital Güemes8built1940