Home
>
Database
>
Canada
>
BC
> Burnaby
Login
Register
View Burnaby
Skyscraper Diagram
Timeline Diagram
Skyscraper Map
Development Map
Discussion Forum
Metropolitian Area Cities
Burnaby is in the metropolitian area of Vancouver.
•
Coquitlam
•
Delta
•
Langley
•
Maple Ridge
•
New Westminster
•
North Vancouver
•
Pitt Meadows
•
Port Coquitlam
•
Port Moody
•
Richmond
•
Surrey
•
Vancouver
•
West Vancouver
•
White Rock
Burnaby
Canada
Status: Built
• 228 highrise buildings
• 243 total structures
• 52 drawn towers
Building Search
Building Status
•
Default
•
All
•
Built
•
Under Construction
•
On Hold
•
Proposed
•
Stale Proposal
•
Cancelled
•
Destroyed
•
Vision
•
Fantasy
Listing 1 to 100 of 318 buildings
Page:
1
-
2
-
3
-
4
-
Next>
Name
|
Floors
|
Status
|
Year
|
Drawings
•
4444 Kingsway
73
proposed
(1)
•
Pinnacle Lougheed Tower 1B
80
proposed
(1)
•
Pinnacle Lougheed Tower 2
76
proposed
(1)
•
5000 Kingsway
70
proposed
(1)
•
Pinnacle Lougheed Tower 1A
73
proposed
(1)
•
Grosvenor Brentwood Block A
70
proposed
(1)
•
Grand Tower at Sky Park
65
under construction
(1)
•
Grosvenor Brentwood Block B
65
proposed
(1)
•
Two Gilmore Place
64
under construction
(1)
•
Citizen
66
proposed
(1)
•
4141 Lougheed Highway A
62
proposed
(1)
•
Concord Metrotown Seven
60
proposed
(1)
•
Brentwood Two
56
built
2020
(2)
•
Altus at Solo District
49
built
2017
(1)
•
Concord Metrotown Eight
47
proposed
(1)
•
Brentwood One
56
built
2019
(1)
•
Grosvenor Brentwood Block C
55
proposed
(1)
•
Concord Metrotown Six
58
proposed
(1)
•
Brentwood Three
55
built
2021
(1)
•
4141 Lougheed Highway B
54
proposed
(1)
•
Highline Metrotown
53
built
2023
(2)
•
6450 Telford Avenue
51
proposed
(1)
•
Station Square V
52
built
2022
(1)
•
4444 Kingsway 2
40
proposed
(1)
•
Hillside East C at Concord Brentwood
55
built
2024
(1)
Name
|
Floors
|
Status
|
Year
|
Drawings
•
One Gilmore Place
51
under construction
(1)
•
Station Square II
48
built
2018
(1)
•
Central Tower at Sky Park
45
under construction
(1)
•
Aerius at Solo District
52
under construction
(1)
•
Grosvenor Brentwood Block D
50
proposed
(1)
•
Hillside West B at Concord Brentwood
49
built
2022
(1)
•
Pinnacle Lougheed Tower 3
50
proposed
(1)
•
The City of Lougheed Tower One
55
built
2023
(1)
•
Concord Metrotown Five
49
proposed
(1)
•
Lougheed Village Infill
48
proposed
(1)
•
The Sovereign/ Element Vancouver Metrotown
43
built
2014
(2)
•
Etoile Gold
47
proposed
(1)
•
Triomphe Residences
46
built
2020
(1)
•
Stratus at Solo District
45
built
2016
(1)
•
Three Gilmore Place
43
under construction
(1)
•
Icon at Southgate City
46
under construction
•
Gilmore Place Phase 2 Office
34
proposed
(1)
•
Nuvo
43
under construction
•
Station Square IV
41
built
2021
(1)
•
Metroplace
44
built
2014
(1)
•
Central Park House
42
under construction
(1)
•
Gold House North
41
built
2020
(1)
•
Hillside East D at Concord Brentwood
45
built
2024
•
Sun Towers I
42
built
2022
(1)
•
Escala
42
built
2019
(1)
Name
|
Floors
|
Status
|
Year
|
Drawings
•
South Yards II
43
under construction
•
Hillside West A at Concord Brentwood
44
built
2022
(1)
•
Station Square III
38
built
2018
•
Modello
37
built
2017
•
Cirrus at Solo District
39
built
2022
•
Akimbo
40
built
2023
(1)
•
Concord Metrotown Four
40
proposed
(1)
•
The Standard Metrotown
43
under construction
•
Tower Six at The Amazing Brentwood
39
under construction
•
Fulton House
41
built
2020
(1)
•
Station Square I
35
built
2015
•
West Tower at Sky Park
33
under construction
•
M Residence & Spa
39
proposed
•
Vittorio
38
built
2020
•
The Met II
38
built
2017
•
Telford on the Walk
40
built
2024
•
The Park Metrotown
37
built
2017
•
Midori
37
built
2018
•
Silver
38
built
2015
(1)
•
The City of Lougheed Tower Three
37
built
2023
•
South Yards I
36
under construction
•
Chancellor
37
built
2013
(1)
•
KC2 at King's Crossing
36
built
2020
•
Impressions Tower 1
36
proposed
•
Riviera
35
under construction
Name
|
Floors
|
Status
|
Year
|
Drawings
•
Metrotower II
29
built
1991
(3)
•
Metrotower III
28
built
2014
(1)
•
Metrotower I
27
built
1989
(3)
•
Ethos
34
proposed
•
Aldynne in the Park
35
built
2017
•
The Met
35
built
2015
•
Impressions Tower 2
32
proposed
•
Centrepoint
32
built
2008
(1)
•
Eclipse at Lumina Brentwood
32
under construction
•
6615 Telford Avenue
31
proposed
•
Vantage
30
built
2013
•
King's Crossing One
31
built
2020
•
Maywood on the Park
32
built
2022
•
Étoile Tower I
32
built
2021
•
The Belgravia
29
built
1997
(1)
•
Grand Corniche I
27
built
1989
(1)
•
Hazel
31
built
2021
•
Claridges at City-in-the-Park
29
built
1999
(1)
•
Artesia Metrotown
31
under construction
•
One Madison Avenue II
30
built
2007
•
One Madison Avenue I
30
built
2007
•
Azure I at Southgate City
30
under construction
•
Mosaic at Renaissance Towers
32
built
2005
•
Silhouette II
32
built
2009
•
Moda
32
built
2015
Name
|
Floors
|
Status
|
Year
|
Drawings
Page:
1
-
2
-
3
-
4
-
Next>
© Copyright 2024 Skyscraper Source Media, All Rights Reserved.
Contact Us
-
FAQ
-
Terms & Conditions
-
Privacy Policy
Privacy Manager