HomeDiagramsDatabaseMapsForumAbout



Moncton NB
Canada

Status: Built
• 10 highrise buildings
• 17 total structures
• 7 drawn towers

Building Search  


Building Status Default  • All  • Built  • Under Construction  • On Hold  • Proposed  • Stale Proposal  • Cancelled  • Destroyed  • Vision  • Fantasy

Listing 1 to 20 of 20 buildings
Name|Floors|Status|Year|Drawings
Infinity30proposed
Place L'Assomption21built1972(1)
Our Lady of the Assumption Cathedral4built1955
Gateway Tower 218under construction
Gateway Tower 118under construction
Three Sisters along the River III15built2026
Three Sisters along the River II15built2025
Three Sisters along the River I15built2023
Blue Cross Centre9built1988(1)
Crowne Plaza Moncton11built1979(1)
Résidence Lafrance à Université de Moncton11built1962
Government of Canada9built(1)
Delta Beausejour Hotel10built1972(1)
Terminal Station8built1972(1)
Cameron Arms10built1981
Tour Lions Tower10built
Terminal Plaza7built(1)
Andal Place8built(1)
Moncton Place6built1996(1)
Bell Aliant Tower6built1971(1)