HomeDiagramsDatabaseMapsForumAbout


Stonecutters Bridge

Rhambler Channel
Hong Kong HK China
http://www.stonecuttersbridge....

Status:
built
Construction Dates
  Began2004
  Finished2009
Building Uses
 - transportation
Structural Types
 - bridge

 Heights ValueSource / Comments 
Roof978 fthttp://www.stonecuttersbridge.net/
Switch heights to


Description
Architects:
• Halcrow Group Limited
• Flint & Neill Partnership
• Dissing+Weitling
• Shanghai Municipal Engineering Design Institute

- Length: 1,596 meters

- Main Span: 1,018 meters

- Bridge Type: Cable-stayed

- The Stonecutters Bridge, is a 3-lane high cable-stayed bridge that makes up part of Route 8 connecting Tsing Yi and Cheung Sha Wan.

Structurae Entry


Google Search  • Images
  
  

Drawing by Levshev
© SkyscraperPage.com



Aerial View - click to view full city map
Google Map



Do you see any incorrect data on this page?  Please let our editors know of any corrections you can make by posting them in the Database Corrections section of the discussion forum (open to the public).




Terms & Conditions
All content displayed on and contained within this page is subject to Skyscraper Source Media Inc.'s Terms and Conditions.  No content displayed on this page may be reproduced, in whole or in part, without prior written permission by Skyscraper Source Media Inc.  All content © Copyright Skyscraper Source Media Inc.