25th of April Bridge Ponte 25 de Abril
| Status: | | | Construction Dates | | Began | 1962 | | Finished | 1966 |
|  | | Building Uses | | - transportation | | Structural Types | | - bridge |
|
Description • Architect: Steinman, Boynton, Gronquist & London (Ray M. Boynton)
• Main Span: 1012.9 m
• Length between anchorages: 2227.6 m
• This bridge connects the cities of Lisbon and Almada.
• Europe's tallest bridge till Pont de Normandie was topped out (completed in 1995)
• The bridge carries 6 automobile lanes on the upper deck, and 2 train tracks on the lower platform. It originally only carried 4 traffic lanes. The middle rail seperating traffic was removed to create the first additional land in 1990, and the second additional lane in 1998.
• Structurae Entry
• Google Search • Images
|
|
| | |