Oberkasseler Rheinbrücke
Rhein-km 744.8 Dusseldorf Germany
|
| Status: | | | Construction Dates | | Began | 1969 | | Finished | 1973 |
|  | | Building Uses | | - transportation | | Structural Types | | - bridge |
|
Description main span: 257.75 m
deck width: 35 m
This bridge was erected next to an existing bridge. The old structure was then demolished and the new bridge moved into the previously occupied location (April 6-7, 1976).
Architect: Friedrich Tamms
• Structurae Entry
• Google Search • Images
|
|
| | |