Estrecho del Corte Culebra (Gaillard Cut), Canal de Panamá Paraiso Panama
Status:
built
Construction Dates
Began
2002
Finished
2004
Building Uses
- transportation
Structural Types
- bridge
Heights
Value
Source / Comments
Spire
604 ft
Wikipedia
Switch heights to
Description Investment: B/ 104'337,000.00
Engineering: Leonhardt Andrä und Partner
Constructor: Bilfinger Berger
General Supervisor: COWI A/S
This Cable Stayed structure with 1,052 meters of length with a space between supports of 420 meters at 80 meters from the standard channel level, have 6 ways of 3.65 meters wide (3 for side) on the highway Arraiján-Panamá (Via Centenario), it's the 2nd bridge who joins both sides of the country.
Do you see any incorrect data on this page? Please let our editors know of any corrections you can provide by posting them in the Database Corrections section of the discussion forum (open to the public).