The project begins on 2008 but was delayed to 2012 when the excavation works starts, now on their 3rd re-design (14, 22, 31 stories) start construction on 2013, with two access, one from the Antonio L Rodriguez avenue is lower by 2 levels from the main entrance of San Jeronimo avenue.