Stadsbrug De Oversteek
| Status: | | | Construction Dates | | Began | 2011 | | Finished | 2013 |
|  | | Building Uses | | - transportation | | Structural Types | | - bridge |
|
Description Architect: Ney Poulissen
Height from lowest bottom river (NAP +2,6)= 80 meter
Height from average waterlevel (NAP+7,5) = 75 meter
Height from natural ground level (NAP+14) = 68,5 meter
Height from highest waterlevel (NAP+14,7) = 67,8 meter
• Google Search • Images
|
|
| | |