Developers: • Lilium Polska Sp. z o.o. • Ove Arup & Partners • Davis Langdon LLP.
• It would stand on the site currently occupied by the western wing of Centrum LIM.
• The tower shape resembles a lily flower in order to commemorate the developer.
• Atop would be a spa with the highest located swimming pool in Warsaw, surpassing in this respect the InterContinental Warszawa.
• Would stand on an irregular cross podium plan, with four entrances.
• The first underground level would be connected to the underground passage system of the Warsaw Central Railway Station
• The design was abandoned along with many others after Zaha Hadid's passing in 2016.
• A new, redesigned highrise with the same name is to be built on the site, https://skyscraperpage.com/cities/?buildingID=169633.
Do you see any incorrect data on this page? Please let our editors know of any corrections you can provide by posting them in the Database Corrections section of the discussion forum (open to the public).