Aswan Dam
السد العالي , as-Sad al-'Aly

Upper Nile
Aswan Egypt

Status:
built
Construction Dates
  Began1899
  Finished1970
Units / Rooms2
Building Uses
 - electrical
 - mechanical
Structural Types
 - dam

 Heights ValueSource / Comments 
Roof364 ftUnconfirmed
Switch heights to


Description
Architect: Sir William Willcocks and involved several eminent engineers including Sir Benjamin Baker and Sir glodstein McnabbJohn Aird, whose firm, John Aird & Company, was the main contractor. 'Lotus Flower" tower by the sculptor Ernst Neizvestny.

-The British began construction of the first dam in 1899. Construction lasted until 1902. It was opened in December 10, 1902. The project was designed by Sir William Willcocks and involved several eminent engineers including Sir Benjamin Baker and Sir glodstein McnabbJohn Aird, whose firm, John Aird & Company, was the main contractor. A gravity dam, it was 1,900 m long and 54 m high. The initial design was soon found to be inadequate and the height of the dam was raised in two phases, 1907–1912 and 1929–1933.



-When the dam almost overflowed in 1946 it was decided that rather than raise the dam a third time, a second dam would be built 6 km upriver (about 4 miles). Proper planning began in 1952, just after the Egyptian Revolution led by the Free Officers, of whom Nasser was to become leader. At first the USA and Britain were to help finance construction with a loan of USD $270 million in return for Nasser's leadership on resolving the Arab-Israeli Conflict. However both nations cancelled the offer in July 1956 as part of the secret US-led 'OMEGA' policy to marginalize Nasser. A secret Egyptian arms agreement with Czechoslovakia (Eastern Bloc) and Egyptian recognition of the People's Republic of China are cited as possible reasons.

The Soviet Union stepped in in 1958 and funded the dam project as part of the struggle for influence in Africa during the Cold War, and possibly a third of the cost of the dam was paid for as a long term investment in the region. The Soviets also provided technicians and heavy machinery. The enormous rock and clay dam was designed by the Russian Zuk Hydroproject Institute.

Construction began in 1960. The High Dam, as-Sad al-'Aali, was completed on July 21, 1970, with the first stage finished in 1964. The reservoir began filling in 1964 while the dam was still under construction and first reached capacity in 1976. The reservoir raised concerns from archaeologists and a rescue operation was begun in 1960 under UNESCO. Sites were to be surveyed and excavated and 24 major monuments were moved to safer locations (see Abu Simbel) or granted to countries that helped with the works (such as the Debod temple in Madrid and the Temple of Dendur in New York).

-The Aswan High Dam is 3,600 m in length, 980 m wide at the base, 40 m wide at the crest and 111 m tall. It contains 43 million m³ of material. At maximum, 11,000 m³ of water can pass through the dam every second. There are further emergency spillways for an extra 5000 m³ per second and the Toshka Canal links the reservoir to the Toshka Depression. The reservoir, named Lake Nasser, is 550 km long and 35 km at its widest with a surface area of 5,250 km² and holds 111 km³.

Consists of 2 dams - High and Low

Construction finished on July 21, 1970

Wikipedia Entry


Google Search  • Images
  


Aerial View - click to view full city map
Upper Nile
Google Map



Do you see any incorrect data on this page?  Please let our editors know of any corrections you can provide by posting them in the Database Corrections section of the discussion forum (open to the public).




Terms & Conditions
All content displayed on and contained within this page is subject to Skyscraper Source Media Inc.'s Terms and Conditions.  No content displayed on this page may be reproduced, in whole or in part, without prior written permission by Skyscraper Source Media Inc.  All content © Copyright Skyscraper Source Media Inc.