Description • Two pylons of a double circuit powerline crossing Vistula river in a 880 metres long span. One circuit is operated with 400 kV and belongs to the powerline from Polaniec Power Station to Byczyna substation, the other belongs to the 220 kV line from Polaniec Power Station to Klikowa substation.
Do you see any incorrect data on this page? Please let our editors know of any corrections you can make by posting them in the Database Corrections section of the discussion forum (open to the public).