Veterans' Glass City Skyway I-280 Toledo OH United States
Status: Construction Dates Began 2001 Finished 2007
Building Uses - transportation Structural Types - bridge
Heights Value Source / Comments Spire 436 ft http://www.lookuptoledo.org/
Switch heights to Meters
Description - Engineer: Figg Engineering Group
- Constractor: E.S. Wagner/FRU-CON
- Length: 2,682.24 meter
- Bridge Type: Cable-stayed
- This bridge contains 20 steel cable stays. • Google Search • Images
© Drawing by
Levshev , SkyscraperPage.com
Do you see any incorrect data on this page? Please let our editors know of any corrections you can provide by posting them in the Database Corrections section of the discussion forum (open to the public).Terms & Conditions All content displayed on and contained within this page is subject to Skyscraper Source Media Inc.'s Terms and Conditions . No content displayed on this page may be reproduced, in whole or in part, without prior written permission by Skyscraper Source Media Inc. All content © Copyright Skyscraper Source Media Inc.