Zilwaukee Bridge

I-75 over Saginaw River
Zilwaukee MI United States

Status:
built
Construction Dates
  Began1979
  Finished1988
Building Uses
 - transportation
Structural Types
 - bridge

 Heights ValueSource / Comments 
Roof125 fthttp://www.michiganhighways.org/
Switch heights to


Description
- Architects/Engineers: Bouvy, van der Vlugt & van der Niet/Segmental Technology & Services

- Contractor: Construction Company (original), S. J. Groves & Sons (post-accident)

- Length: 8,066 feet northbound, 8,090 feet southbound

- Width: 4 lanes, 70'-10"

- Bridge Cost: $117.5 million

- The bridge contains 1,592 pre-cast concrete segments.

- The bridge contains 52 support pillars.

- The bridge contains approximately 150,000 cubic yards of concrete, 22 million pounds of reinforcement steel, 4,000 miles of half-inch steel cables.

- On August 28, 1982, a construction accident occurred when the piers could not effectively hold the weight of the bridge causing it to buckle delaying construction for years.

- The northbound lanes of the bridge opened to traffic on December 23, 1987, and the southbond lanes nearly a year later on September 19, 1988.

Structurae Entry


Google Search  • Images
  
  

© Drawing by Good, SkyscraperPage.com




Do you see any incorrect data on this page?  Please let our editors know of any corrections you can make by posting them in the Database Corrections section of the discussion forum (open to the public).




Terms & Conditions
All content displayed on and contained within this page is subject to Skyscraper Source Media Inc.'s Terms and Conditions.  No content displayed on this page may be reproduced, in whole or in part, without prior written permission by Skyscraper Source Media Inc.  All content © Copyright Skyscraper Source Media Inc.