HomeDiagramsDatabaseMapsForumAbout



C1-Strainer Pylon
C1-Abspannmaste

Anlage 4507
Ludwigsburg Germany

Status:
built
Construction Dates
  Began1926
  Finished1926
Building Uses
 - electrical
Structural Types
 - truss tower
 - cross brace

 Heights ValueSource / Comments 
Spire107 ftWikipedia
Height uppermost crossbar98 ft''
Height second crossbar79 ft''
Height lowest crossbar59 ft''
Switch heights to


Description
• C1 pylons were used for the section between Ludwigsburg and Bad Neuenahr of the such called "Nord-Süd-Leitung", the first 220kV-powerline in the world. Nord-Süd-Leitung allowed an effective exchange of electrical power between the coal fired power stations at Northrhine-Westphalia and the hydroelectric power plants in Austria and Southern Black Forest.

• This line, which was built by RWE AG was the germ cell of the European high voltage power grid.Beside this C1-pylons are from unique design and were only used or the section between Ludwigsburg and Bad Neuenahr of Nord-Süd-Leitung. A model of a C1-pylon is shown in German Museum in Munich.

• C1-pylons are designed for two three phase AC-circuits (6 conductors) with a maximum voltage of 380 kV, but used only for 220 kV-lines.

Wikipedia Entry (German)


Google Search  • Images
  
  

© Drawing by Ganymed, SkyscraperPage.com




Do you see any incorrect data on this page?  Please let our editors know of any corrections you can provide by posting them in the Database Corrections section of the discussion forum (open to the public).




Terms & Conditions
All content displayed on and contained within this page is subject to Skyscraper Source Media Inc.'s Terms and Conditions.  No content displayed on this page may be reproduced, in whole or in part, without prior written permission by Skyscraper Source Media Inc.  All content © Copyright Skyscraper Source Media Inc.