Ammonia Pipeline Bridge мост через Днепр аммиакопровода Тольятти - Одесса
Vovnihy Ukraine
Status:
built
Construction Dates
Finished
1979
Building Uses
- transportation
- industrial
Structural Types
- bridge
Heights
Value
Source / Comments
Roof
285 ft
Unconfirmed
Switch heights to
Description • The bridge over the Dnieper river is part of ammonia pipeline Togliatti – Odessa
• Design: Dniepersteelconstructia (structural engineers V. J. Stoliar, M. M. Rotmistrovski, E. I. Shklovski)
• Length of of main span: 720 m
Do you see any incorrect data on this page? Please let our editors know of any corrections you can provide by posting them in the Database Corrections section of the discussion forum (open to the public).