Muiderbrug
| Status: | | | Construction Dates | | Began | 2009 | | Finished | 2010 |
|  | | Building Uses | | - transportation | | Structural Types | | - bridge |
|
Description Architect: Rijkswaterstaat
Built between 1970-1972, but transformed into a Cable-stayed bridge with 70 meter high pylons.
The Bridge expanded with extra lanes, because of the increasing traffic pressure
• Wikipedia Entry (Dutch)
• Google Search • Images
|
|
| | |