Ventura Corporate Towers

Avenida República do Chile, 300
Rio de Janeiro RJ Brazil

Status:
built
Construction Dates
  Began2006
  Finished2010
Floor Count41
Building Uses
 - office
 - parking garage
 - restaurant
 - retail
Structural Types
 - highrise
 - landing pad

 Heights ValueSource / Comments 
Roof459 ft
Lobby ceiling30 ft''
Switch heights to


Description
• Architects: Aflalo & Gasperini Arquitetos, Kohn Pedersen Fox Associates PC http://www.kpf.com/main.asp.

• Constructors: Acústica & Sônica, Arcelor Brasil, Arq e Urb Projetos, Beltec Engenharia Ltda, Bosco & Associados Ltda, Brasiliano & Associados, Camargo Correa Desenvolvimento Imobiliario, Concremat, DW/Santana, Engemix, Engenheiros Consultores Associados Consultrix S/C Ltda., Gondomatic Representações Ltda., HR Assessoria Aeronáutica, Israel Berger & Associates, Jones Lang LaSalle Inc., Júlio Kassoy & Mário Franco, Knauf do Brasil Ltda., Laboratório de Aerodinâmica da Construção/UFRGS, MAC Protensão, Meta Núcleo de Projetos e Serviços Ltda., Método Engenharia Ltda., MHA Engenharia, MVS, PROASSP - Assessoria e Projetos, Teknika Projetos e Consultoria SC Ltda., Tengel Engenharia, ThyssenKrupp Elevadores S.A., Tishman Speyer GmbH & Co., Vecotec Sistemas de Climatização.
___________________________________________________________

• The building has two helipads, one in each tower.
• Excavation started in March 2006 and construction in April 2006, which the project was renamed from Rio Towers to Ventura Corporate Towers.
• Construction of the first phase began in April 2006. Phase A of this project was topped out in October 2007. Construction of Phase A was completed three months ahead of schedule, in July 2008.
• The second phase of the project, the Phase and Tower B, was scheduled to be finished by 2010. Excavation works for the Phase B started in December 2007.
• The site where this building is located has 8550 m² of area, which was purchased from UFRJ (Universidade Federal do Rio de Janeiro).
• Rain and condensation waters' from the air-conditioning systems is used to irrigate the landscaped areas.
• The building is LEED certified.
• In total, there are 42 elevators: 22 in Phase A and 20 in Phase B.
• There is 2,400 m² of retail in entrance level.
• Both buildings has 36 habitable storeys, 32 common floors, Ground Floor, 1 mezaninos and 1 terrace atop and 1 mechanical lower heliport atop. An attached 5-storeys Garage building + 5 basement is seen in project for 1500 vehicles.


Google Search
  
  

Drawing by Mecanoid
© SkyscraperPage.com



Aerial View - click to view full city map
Google Map



Do you see any incorrect data on this page?  Please let our editors know of any corrections you can make by posting them in the Database Corrections section of the discussion forum (open to the public).




Terms & Conditions
All content displayed on and contained within this page is subject to Skyscraper Source Media Inc.'s Terms and Conditions.  No content displayed on this page may be reproduced, in whole or in part, without prior written permission by Skyscraper Source Media Inc.  All content © Copyright Skyscraper Source Media Inc.