Description Developer: Huaneng (Tianjin) Clean Energy Co., Ltd.
• The 7 wind turbines of this project complex are arranged in a line along the Dongjiang North Breakwater, with an actual total distribution span of about 4.5 kilometers from Tower 1 to Tower 7. The 7 turbines form 6 intervals in total, with an average spacing of about 750 meters, and this layout complies with the safe operation specifications for offshore wind power projects.
Do you see any incorrect data on this page? Please let our editors know of any corrections you can provide by posting them in the Database Corrections section of the discussion forum (open to the public).