HomeDiagramsDatabaseMapsForumAbout



Chubu Centrair International Airport Flight of Dreams & Terminal 2
中部国際空港セントレア フライトオブドリームズ / 第2ターミナル

1-1 Centrair
Tokoname Japan

Status:
built
Construction Dates
  Finished2018
Floor Count3
Building Uses
 - transportation
 - museum
 - retail
 - station
 - showroom
Structural Types
 - lowrise

 Heights ValueSource / Comments 
Roof79 ftaviationwire.jp
Flight of Dreams building
Switch heights to


Description
Total Floor Area
Terminal 2: 45,000 sqm. (484,376 sq ft)
Flight of Dreams: 11,000 sqm. (118,403 sq ft)
Both facilities combined: 56,000 sqm. (602,779 sq ft)

The figures shown above (floor count, height, and completion year) correspond to the Flight of Dreams.

The Flight of Dreams is a facility that houses ZA001, the first Boeing 787 Dreamliner ever built. This facility is connected to Terminal 2, which opened in 2019 (almost a year after the opening of Flight of Dreams).

Terminal 2 has two floors above ground and seems to be roughly half the height of the Flight of Dreams building. It is used by LCCs (low-cost carriers).


Google Search  • Images
  


Aerial View - click to view full city map
1-1 Centrair
Google Map



Do you see any incorrect data on this page?  Please let our editors know of any corrections you can provide by posting them in the Database Corrections section of the discussion forum (open to the public).




Terms & Conditions
All content displayed on and contained within this page is subject to Skyscraper Source Media Inc.'s Terms and Conditions.  No content displayed on this page may be reproduced, in whole or in part, without prior written permission by Skyscraper Source Media Inc.  All content © Copyright Skyscraper Source Media Inc.