Description Architects: • Feliks Niczke • J. Matwiszyn (construction of dam) • Z. Szymczak (construction of dam) • R. Barucki (design) • W. Neuman (design) • R. Wiśniowska (power plant construction) • T. Owczarski (power plant construction)
Tallest dam in Poland. 664 metres long gravity dam made of concrete, used for a hydroelectric power plant with an output power of 200 MW
Do you see any incorrect data on this page? Please let our editors know of any corrections you can provide by posting them in the Database Corrections section of the discussion forum (open to the public).