Linköping Arena
Kallerstads Allé 1A Linköping Sweden
|
| Status: | | | Construction Dates | | Finished | 2018 | | Floor Count | 14 |
|  | | Building Uses | | - mixed use | | - education | | - office | | - residential | | - sports | | Structural Types | | - highrise | | - stadium |
|
Description The Arena was built 2011-2013.
Two adjoining office buildings and a school were built 2015-2016.
Two mixed-use buildings, including the highrise, were built in 2018.
• Wikipedia Entry
• Google Search • Images
|
|
| | |