Puente Atlántico
| Status: | | | Construction Dates | | Began | 2013 | | Finished | 2019 | | Floor Count | 1 |
|  | | Building Uses | | - communication | | Structural Types | | - bridge |
|
Description Engineering: China Communication Construction Company (CCCC) / Louis Berger Group
Constructor contractor: Vinci Construction
The four-lane concrete cable-stayed bridge with the longest span between the central columns in the world, with 530 meters, the main road at 75 meters above sea level, the tallest column 4(East) with a foundation of 35 pylons with 2.5 meters diameter and 50 meters deep.
• Wikipedia Entry (Spanish)
• Google Search • Images
|
|
| | |