Gordie Howe International Bridge
| Status: | | | Construction Dates | | Began | 2020 | | Will finish | 2026 |
|  | | Building Uses | | - transportation | | Structural Types | | - bridge |
|
Description - The bridge will have a total span of 2.5 km, including a main span of 853 m. The bridge will be 37.5 wide and clear the river at a height of 42 m.
- The bridge will carry three automobile traffic lanes in each direction an a bi-directional multi-use path on the northern sid eof the bridge.
• Google Search • Images
|
|
| | |