Ontario Court of Justice Toronto 10 Armoury Street Toronto ON Canada
Status: Construction Dates Began 2018 Finished 2023 Floor Count 17 Basement Floors 2
Building Uses - courthouse Structural Types - highrise
Heights Value Source / Comments Roof 314 ft elevation drawings Top floor 275 ft elevation drawings
Switch heights to Meters
Description Architects: • Renzo Piano Building Workshop • NORR • Ventin Group Ltd. Developer: Infrastructure Ontario • Google Search • Images
© Drawing by
Koops65 , SkyscraperPage.com
Do you see any incorrect data on this page? Please let our editors know of any corrections you can make by posting them in the Database Corrections section of the discussion forum (open to the public).Terms & Conditions All content displayed on and contained within this page is subject to Skyscraper Source Media Inc.'s Terms and Conditions . No content displayed on this page may be reproduced, in whole or in part, without prior written permission by Skyscraper Source Media Inc. All content © Copyright Skyscraper Source Media Inc.