- Owner: Grupo Villar Mir
- Constructors: Company - OHL
U.T.E. FCC Dragados / Geotecnia y Cimientos, S.A. / Horta Coslada, S.L. / EMTE, S.A. / Atil-Cobra, S.A. / Zardoya Otis, S.A. / Pavimentos Godur Andalucia, S.L. / Fire-Stop Mediterraneo, S.A. / Saint-Gobain Wanner, S.A. / Iberkaba, S.A. / Gomyl, S.A. / Decoraciones Metalicas
- Investment: 390 million Euros
This reinforced concrete structure strarts on the lower levels as a rectangular form, decreasing every level showing a soft curve providing a turning shape.
Caught on fire on the levels 42 & 43 on September 4th of 2006.
-Have no 13th floor
• Phorio Entry
• Wikipedia Entry (Spanish)
• SkyscraperCenter Entry
• Structurae Entry
• Google Search
![]() Drawing by Martin H Unzon © SkyscraperPage.com |
Aerial View - click to view full city map | ||||
|
Do you see any incorrect data on this page? Please let our editors know of any corrections you can make by posting them in the Database Corrections section of the discussion forum (open to the public). Terms & Conditions All content displayed on and contained within this page is subject to Skyscraper Source Media Inc.'s Terms and Conditions. No content displayed on this page may be reproduced, in whole or in part, without prior written permission by Skyscraper Source Media Inc. All content © Copyright Skyscraper Source Media Inc. |
© Copyright 2021 Skyscraper Source Media, All Rights Reserved. | Contact Us - FAQ - Terms & Conditions - Privacy Policy | |