HomeDiagramsDatabaseMapsForumAbout
In this section -



Timra
Sweden

Status: Built
• 2 highrise buildings
• 2 total structures
• 0 drawn towers

• Wikipedia Page• City Website


Building Search  




Timra Building List

Status • DEFAULT  • All  • Built  • Under Construction  • On Hold  • Proposed  • Stale Proposal  • Cancelled  • Destroyed  • Vision  • Fantasy

Listing 1 to 7 of 7 buildings
Name|Floors|Status|Year|Drawings
•Stor-Skalsjon Wind Farm Southbuilt2023
•Ostrand Recovery Boiler 512built1982
•Ostrand Lime Kiln Chimney (new)built2011
•Ostrand Chimneybuilt
•Ostrand Boilerhouse 1built1971
•Ostrand Recovery Boiler 6built2006
•The Y1built1995