|  | Puente Centenario
Estrecho del Corte Culebra (Gaillard Cut), Canal de Panamá Paraiso Panama
|
| Status: | | | Construction Dates | | Began | 2002 | | Finished | 2004 |
|  | | Building Uses | | - transportation | | Structural Types | | - bridge |
|
Description Investment: B/ 104'337,000.00
Engineering: Leonhardt Andrä und Partner
Constructor: Bilfinger Berger
General Supervisor: COWI A/S
This Cable Stayed structure with 1,052 meters of length with a space between supports of 420 meters at 80 meters from the standard channel level, have 6 ways of 3.65 meters wide (3 for side) on the highway Arraiján-Panamá (Via Centenario), it's the 2nd bridge who joins both sides of the country.
Reference image: http://www.eventostoppanama.com/wp-content/uploads/2010/12/puente-centenario.jpg
• Google Search • Images
|
|
| | |
| Complete the Human Verification to display the map. | Estrecho del Corte Culebra (Gaillard Cut), Canal de Panamá | • Google Map |
|
| | |
Do you see any incorrect data on this page? Please let our editors know of any corrections you can provide by posting them in the Database Corrections section of the discussion forum (open to the public).
Terms & Conditions All content displayed on and contained within this page is subject to Skyscraper Source Media Inc.'s Terms and Conditions. No content displayed on this page may be reproduced, in whole or in part, without prior written permission by Skyscraper Source Media Inc. All content © Copyright Skyscraper Source Media Inc. |
|
|
|