Central Hidroelectrica Manuel Moreno Torres "Chicoasen"

Rio Grijalva
Presa Chicoasén Mexico
http://www.cfe.gob.mx/es/LaEmp...

Status:
built
Construction Dates
  Finished1980
Building Uses
 - electrical
 - mechanical
Structural Types
 - dam

 Heights ValueSource / Comments 
Roof860 fthttp://www.cfe.gob.mx
Switch heights to


Description
Developer: Comision Federal de Electricidad

• Power: 2400 MW (8 generators of 300 MW each):
- 1500 MW with 5 turbines finished in 1981,
- 900 MW with 3 aditional turbines in 2004.

• 10 Transmission Lines: 6 of 400 KV and 4 of 115 KV.

Wikipedia Entry (Spanish)


Google Search  • Images
  
  

© Drawing by Good, SkyscraperPage.com



Aerial View
Complete the Human Verification to display the map.
Rio Grijalva
Google Map



Do you see any incorrect data on this page?  Please let our editors know of any corrections you can provide by posting them in the Database Corrections section of the discussion forum (open to the public).




Terms & Conditions
All content displayed on and contained within this page is subject to Skyscraper Source Media Inc.'s Terms and Conditions.  No content displayed on this page may be reproduced, in whole or in part, without prior written permission by Skyscraper Source Media Inc.  All content © Copyright Skyscraper Source Media Inc.