Weihetalbrücke Gerstungen

Bundesautobahn 4
Gerstungen Germany

Status:
built
Construction Dates
  Began1992
  Finished1994
Building Uses
 - transportation
Structural Types
 - bridge


Description
Architects:
• Hensel Ingenieur
• EHS beratende Ingenieure für Bauwesen

Owner: Bundesrepublik Deutschland/Bundesministerium für Verkehr

Structural Engineer: Wallerich und Partner

Contractor: Wayss & Freytag

- Total Length: 584 meters

- This prestressed concrete bridge carries Bundesautobahn 4 over part of the Weihe river valley.

- Work on the bridge originally began in 1938, but was stopped in 1940 because of World War II. Work was restarted on the bridge in 1992, after the reunification of East and West Germany. It was finally completed and opened to traffic in 1994.

- The old bridge columns were considered unfit and structurally unsound and demolished during the modern reconstruction of the bridge, though, two were kept as monuments.

Structurae Entry


Google Search  • Images
  


Aerial View
Complete the Human Verification to display the map.
Bundesautobahn 4
Google Map



Do you see any incorrect data on this page?  Please let our editors know of any corrections you can provide by posting them in the Database Corrections section of the discussion forum (open to the public).




Terms & Conditions
All content displayed on and contained within this page is subject to Skyscraper Source Media Inc.'s Terms and Conditions.  No content displayed on this page may be reproduced, in whole or in part, without prior written permission by Skyscraper Source Media Inc.  All content © Copyright Skyscraper Source Media Inc.