Status:
built
Construction Dates
  Finished2020
Building Uses
 - electrical
Structural Types
 - tower

 Heights ValueSource / Comments 
Spire226 ftUnconfirmed
Switch heights to


Description
Architect: Hugh Dutton

Developers:
• Iemants
• Eiffage Énergie Systèmes

Electricity pylons for two 400 kV three-phase AC circuits, with a design intended to evoke the image of a boat mast. In opposite to other types of electricity pylons, there is no difference between dead-end and suspension pylons.

The first prototype of this pylon was erected in 2020 on the area of La Capelle substation. In 2022 45 Équilibre Pylons were built for the new powerline between Avelin and Gavrelle substation.


• Google Search  • Images
  
  

© Drawing by Ganymed, SkyscraperPage.com



Aerial View
Complete the Human Verification to display the map.
• Google Map



Do you see any incorrect data on this page?  Please let our editors know of any corrections you can provide by posting them in the Database Corrections section of the discussion forum (open to the public).




Terms & Conditions
All content displayed on and contained within this page is subject to Skyscraper Source Media Inc.'s Terms and Conditions.  No content displayed on this page may be reproduced, in whole or in part, without prior written permission by Skyscraper Source Media Inc.  All content © Copyright Skyscraper Source Media Inc.