HomeDiagramsDatabaseMapsForumAbout




Pachuca

Building Search  
Phorio Page



Building Status Default  • All  • Built  • Under Construction  • On Hold  • Proposed  • Stale Proposal  • Cancelled  • Destroyed  • Vision  • Fantasy

Listing 1 to 10 of 10 buildings
Name|Floors|Status|Year|Drawings
Via Dorada20built2020
Torre del Colegio de Postgrado UAEH18built2020
Conjunto Qualia Torre 2021under construction
Conjunto Qualia Torre 1818proposed
Conjunto Qualia Torre 1616proposed
Torre Prisma12built2007
Torres de Plata10built2007
Ribara 11410built2021
Cristo Rey1built(2)
Reloj Monumental4built1910(1)