HomeDiagramsDatabaseMapsForumSkyscraper Posters



Switch heights to



Lee House Extension

90 Great Bridgewater Street
Manchester ENG United Kingdom

Status:proposed
Construction Dates
  Begin1928
  End2007
Floor Count16
Basement Floors2
Building Uses
 - mixed use
 - office
 - residential
Structural Types
 - highrise
Materials
 - brick

 Heights ValueSource / Comments 
Roof226 ft

Description
The Lee House Extension project involves the addition of 8 residential and office floors to the existing 8 story office building, following the original plans from the 1920s as closely as possible.

Lee House was originally planned to be around 65m high and Europe's tallest office building when it was being built in the early 1930s, but a market downturn meant the developers had to shorten the building to 36m and 8 floors to save money, the building was completed in 1931.

Floors 1-9 will be offices and floors 10-16 will be apartments.

Google Search
  
  

Drawing by Chris Wilkinson
© SkyscraperPage.com

View All Drawings (1)
 
View Chris Wilkinson's Diagram
 
View Manchester Diagram
View England Diagram
View United Kingdom Diagram


Aerial View / Map - Location within Manchester

View Manchester Map Centered on BuildingView Full Manchester MapView Building on Google Maps



Do you see any incorrect data on this page?  Please let our editors know of any corrections you can make by posting them in the Database Corrections section of the discussion forum (open to the public).




Terms & Conditions
All content displayed on and contained within this page is subject to Skyscraper Source Media Inc.'s Terms and Conditions.  No content displayed on this page may be reproduced, in whole or in part, without prior written permission by Skyscraper Source Media Inc.  All content © Copyright Skyscraper Source Media Inc.