Toronto Mega Development Thread (Catchall)


Originally Posted by waterloowarrior
Urbanation: One Bloor to be 65-storeys
with 785 residential apartment suites,
497 parking spaces on five underground
levels, and 6,500 m2 of commercial.
1 bloor details
____
 
Ethervizion took another time lapse
sequence. This
one is from Feb. 2:
www.flickr.com/photos/ethervizion/
They've expanded the site. There's barely
a narrow walkway between the
construction site and College Park now,
and it comes very close to the skating rink
too.
__________________
"TORONTINIUMCONSTRUCTIONUEthervizion took another time lapse
sequence. This
one is from Feb. 2:
www.flickr.com/photos/ethervizion/
They've expanded the site. There's barely
a narrow walkway between the
construction site and College Park now,
and it comes very close to the skating rink
too.
 
4 Feb 2010:

dsc00376j.jpg


dsc00380y.jpg

tiff from urbandreamer at UT
 
this is by me

4343591061_26e6d940a8_b.jpg


4343596433_9293048413_b.jpg


4344350838_7413f452b7_b.jpg


4344359640_4997d28aea_b.jpg



WhipperSnapper
Goodlookin' Join Date: Sep 2002
Location: Toronto
Posts: 5,380



What's the point of this thread? It's just a re-posting of the Top 30.


I just thought it would be a good way to avoid conflict with the western's regarding Toronto based construction.
 
^Maybe they can do liquid architecture the right way. Thus far representations of buildings like this have really sucked, IMO. If that is glass and steel as opposed to white painted concrete it should work.
 
One Bloor has been confirmed at 65 storeys and 215 meters. Not as tall as the Bazis proposal but still a major development in overall terms.
 
from Solaris at UT some shots at dusk ... looks like Legacy's tower is @ 10th floor ~ :)
this project is in willowdale. inner suburb of toronto. next to don mills subway
Legacy (phase 1) Tower - Southwest + Southeast Elevations
Click to Enlarge


Legacy (phase 1) Lowrise - Southwest + Northeast Elevations
 
I've got a quick question. Before the current Festival Tower design was approved, wasn't there another designed planned for the site? I remember a curved and slender 50 story+ tower rendering being posted on here? Can anyone help me out and tell me what happened to the design? It's a shame it wasn't built!
 
Pretty sure that was just a concept ... a finalist if you will ... that lost out to the current design. Unfortunately, I can't remember the architect so it's impossible to google. I do find the better design is being built.
 
guys stay tuned.. I'm doing a massive development update this weekend, even though there was a snowstorm. I'll catch more of the Low Rise Projects. no towers. I promise. So I'll post the updates here and in the construction thread in the Canada Forum.
 
Here's the latest construction update from Brookfield:


March 27 through April 3, 2010

The following is work scheduled to take place at First Canadian Place. Please note, crews will
not be working Friday April 2, 2010.

Tower Exterior – East Face
o Weather permitting, cross-bracing and permanent decks will be installed
on the four (4) pole scaffold on floors 11-20 by April 3, 2010.

Tower Exterior – West Face
o Weather permitting, the four (4) pole scaffolding will reach the floors 65
through to the roof-top by April 3, 2010.
o Work on the Suspended Elevated Platforms (SEP) will be on-going on
floors 3 through 7. Work is completed during the day and throughout
the evening.

Tower Exterior – North Face
o Work on the Suspended Elevated Platforms (SEP) will be on-going on
floors 3 through 9. Work in this area is expected to be complete April
16, 2010. Work is completed during the day and throughout the
evening.


Tower Exterior – South Face
o Work on the Suspended Elevated Platforms (SEP) will be on-going on
floors 3 through 7. Work is completed during the day and throughout
the evening.


Tower Exterior – King Street West, Street Level
o No work is anticipated in this area.


Tower Exterior – 73rd floor, Penthouse Rooftop
o Weather permitting, roof scaffolding and motor placement will occur
through April 3, 2010. Intermittent noise may be assoicated with this
work.

o Interior “Market Place” – Concourse Level
o Until April 3, 2010, the east-west main corridor in the Market Place will
be closed to pedestrian traffic. Access to the remaining food outlets and
the Exchange Tower is by means of the north-south corridor by
Timothy’s.
o NOW OPEN in the Market Place are: Timothy’s, Naturally Yours
(temporary location), HoShim Take-out and The Great Canadian Bagel
(NEW location).
o Closed for renovations are: Greenleaf’s, Furama, Soup It Up (new
location), Decadent Desserts (new location) and Rocky Mountain
Chocolate Factory. Most of these foods outlets will be open for business
by the end of May 2010.
o Longo’s is scheduled to open on the south side of the Market Place, in
Summer 2010.

NOTICE OF LANE REDUCTION(S)
o There will be a crane lift on Adelaide St.W., from 7:00 am until 1:00
p.m. on Saturday, March 27, 2010. This will necessitate a lane closure in
the immediate work area only. Access to the building via the doors by
PLUS ONE (Adelaide St.W., east-most building entrance) may be
temporarily impeded during the lift operation.
o Inspection crews will be working on a boom lift on each Adelaide St.W.,
Bay St. and King St W., from 7:00 p.m. until 2:00 a.m. on each Monday,
March 29 through Thursday April 1 and Saturday April 3, 2010. Lanes
will be restricted in the immediate area.


I'm gonna start linking the Canada Forum on Urban Toronto, and SSC. This is ridiculous. There are 6 Million Torontioans we cant get enough people on this board??
 


Back
Top