The "Delay" Rant Thread

  • Thread starter Thread starter Cambridgite
  • Start date Start date

C

Cambridgite

Guest
Alright guys, it looks as if centre block is now being delayed. This is on top of delays for Kaufman Lofts, UW Pharmacy, Arrow Lofts, Bauer Lofts, the bottom floor of Eaton Lofts, and of course, the dreadful construction bottleneck of highway 8 and probably other things I can't even think of right now. Here is where we deposit our whining, complaining, etc, about all the delayed crap. :jester:
 
I agree, but every development faces these delays. Nothing gets done on time. Between Beaurocratic red tape, labour strikes and developer non-committal it seems every major development is doomed from the get go.

The Barrel Yards development in Waterloo is one that will surely suffer from this. I can't see it being complete until at least 2015, likely later, and I'd be shocked if the two 25 story towers are ever built.

I remember First Gulf's original vision for WTS, it was beautiful. Big glass towers, a pedestrian corridor, everything we could hope for. Unfortunately it never came to be and now we're left with a shadow of what could have been. I'm afraid imagine the Barrel Yards will follow a similar path...
 
I agree, but every development faces these delays. Nothing gets done on time. Between Beaurocratic red tape, labour strikes and developer non-committal it seems every major development is doomed from the get go.

The Barrel Yards development in Waterloo is one that will surely suffer from this. I can't see it being complete until at least 2015, likely later, and I'd be shocked if the two 25 story towers are ever built.

I remember First Gulf's original vision for WTS, it was beautiful. Big glass towers, a pedestrian corridor, everything we could hope for. Unfortunately it never came to be and now we're left with a shadow of what could have been. I'm afraid imagine the Barrel Yards will follow a similar path...

What worries me about Barrel Yards is if they find contamination. If they don't find it, it may go according to a decent schedule. If they do, I'll have grey hairs before I see the first cranes go up.

As far as the original WTS development goes, wasn't that proposed in 1999? If I recall, urban redevelopment projects were unheard of at that time, so I don't blame prospective tenants for shying away from the overly ambitious proposal that included a movie theatre. The project was quite simply ahead of its time.

With all of the more recent (but largely smaller) successes, I think businesses are starting to see that there's a market here. I think Barrel Yards will go ahead, but as the document said, it will be phased out over several years. I think it will have an effect of saturating the residential market in Uptown Waterloo as well.

We may even see the WTS project come back to life eventually, but only if the parking nazis can be silenced. :rolleyes:
 
The barrel yards project will not be done until 2015 for sure. you can't expect that those buildings will be built in a year. the project is going to be phased this is according to every report Auburn developments has ever written for this project their estimate is that it will take 7-10 years to be fully completed. This time frame is based on demand. Further the project will be phased starting with the office building and the 2 25-storey condo buildings and then the hotel. what is next has yet to be decided. don't expect that Auburn is going to come in here and build everything at once they are a business and they are here because the market is here and they can turn a profit from that market. Assuming we don't go into a recession they will be built most likely with a finish date of 2015.

As for the bauer loft i will not be surprized if there is delays on that one because the owner intends on building a parking garage below the exising building...... yea you heard me below the exisiting building.... that will take months to build so don't expect it to be above ground any time soon.... not to mention if they screw up that construction and knock the existing building down. if that happens there could be even more delays since the only reason the existing builing is staying is so that they can keep the existing setbacks on the property

Lastly as fro construction projects as whole esspecially on brownfields there will always be delays. on a whole about 70% or more of constuction projects end up finishing past the regular sechedule. on brownfields that number is much more because there is so much more that can go wrong. plus there is additional red tape. but my belief is atleast carful planning is being consided so that we don't end up with disasters in our down town cores
 
^ Well said and I agree. At least it's being done right. We can get a little anxious here on SSP sometimes.
 
The excellent economic conditions we are all enjoying bring many benefits. They also come with a few challenges. One of them is a shortage of skilled labour for building new homes in a predictable time frame.

We should advertise ourselves as the "Fort McMurray of Ontario" and set up trailer parks all over the edge of town for temporary workers. :haha:
 
Last edited:
Be thankful you don't live in Hamilton, it can take decades before shovels hit the ground here.
 