QEW Gridlock


bornagainbiking

New member
I used to work in Toronto and did the drive thing but that was 13 yrs ago. I hate to go to Toronto but have to occasionally.
I did a run to the Airport (twice this weekend) and it is brutal and expensive to do a pickup.
I like the idea of a staging area along the road and wait for a call to advance into the pick up area. (More of this would be great and alot cheaper).
I can not believe that it was stop and start traffic going from Toronto to Burlington at one in the afternoon on a Easter Sunday.
This has gone on too long, someone address this issue.
I know I drove, but could I get from Hamilton to PIA and return in under 2 hrs.
:shrug:
 
Go GO

Go Transit is great and very quick if you are going say Aldershot or Burlington to Union. But for time wise most anything else you have the GO>TTC thing. The airport connection is labour intensive.
For Toronto, if you have to worry about parking $$$$ Use Go.
For a Easter Sunday, and just a drop off, I drove. Maybe next time I will use the 407. Time is money.:cheers:
Parking is super $$$$ but try and stop anywhere near there.
 
take the 407 west GO Bus to Square One, than take the GO bus to Pearson... takes just over an hour each way if you leave from McMaster I think
 
Yup, 407 is what to use if you don't want to sit in traffic. Expanding the 403 will mean more traffic in the end (generated traffic), so the 407 is your best shot, and a more likely alternative for more and more drivers over the coming number of years.
 
Steal a plane from Hamilton International and fly to Pearson. It "sort of" worked for that guy from Thunder Bay last week.
 
Yeah, and Canada is pretty tolerant so you probably won't get arrested at the end, either.
 
Once the Burloak-Royal Windsor section has its widening done (they still have to replace the old 16 Mile Creek bridge) then they will move on to the Guelph-Burloak section. There will be HOV lanes just like certain parts of 400, 403, 404.
 
Don't forget about the Niagara-GTA Corridor Planning and Environmental Assessment Study currently being undertaken by the MTO. This was formerly known as the Mid-Peninsula Highway study. Part of this EA plans to remove some traffic from the congested QEW.

Niagara-GTA EA Website
 
Southern Ontario (GTA)

I don't know how people do it day in and day out. I don't know how i did it for 2 yrs 15 yrs ago and it was less traffic then.
I took the 407 around 2ish and 4 p.m ish Tuesday and Wed and the 401 was a parking lot. They say it is like that daily to Milton now.
That is insane, no wonder there is road rage with the frustration and just selfish bad driving habits.
something has to be done ASAP. limit truck traffic from peak hours.
GO is an option but not for everyone unless you grouped worksites as even car-pooling could be difficult.
Maybe companies have to go like the old days and promote or encourage group housing. Build satilite offices or really implement flex hours. more time working and less time driving.
Allow staff to come in early have a gym set up and the time it would have been in the commute could be on a treadmill. Get discounted gym membership for a 24 hr gym near the workplace. There has to be an answer to the daily commute, relocate the company to Wawa, or Sturgeon Falls.
:haha: :haha:
 
St Lawrence seaway or H2O highway

Read an article a couple of days ago.
They are using barges now to move containers from Montreal to Hamilton.
So it reduces at least one link by taking the cargo from the ocean freighter to the barge and eliminating the truck link.
It is slightly slower but can run 24/7 and reduces pollution with less truck traffic. one barge can take alot of containers over one contaier per truck.
I guess that this will be a growth industry sailors and the old stevedore.
:cheers: :cheers:
 
I don't know how people do it day in and day out. I don't know how i did it for 2 yrs 15 yrs ago and it was less traffic then.
I took the 407 around 2ish and 4 p.m ish Tuesday and Wed and the 401 was a parking lot. They say it is like that daily to Milton now.
That is insane, no wonder there is road rage with the frustration and just selfish bad driving habits.
something has to be done ASAP. limit truck traffic from peak hours.
GO is an option but not for everyone unless you grouped worksites as even car-pooling could be difficult.
Maybe companies have to go like the old days and promote or encourage group housing. Build satilite offices or really implement flex hours. more time working and less time driving.
Allow staff to come in early have a gym set up and the time it would have been in the commute could be on a treadmill. Get discounted gym membership for a 24 hr gym near the workplace. There has to be an answer to the daily commute, relocate the company to Wawa, or Sturgeon Falls.
:haha: :haha:

Blame decentralization. Work places are way to scattered now and that is the issue. The office are not even built on GO Train stations, but out in farmers fields far from the stations. Its no wonder we have traffic.

If you can help it, don't accept a suburban job, and look for downtown Toronto jobs. I know a number of people who are doing that, and their commutes are a breeze on transit. :)
 
Problems, with Solutions

To be sure, ill-planned growth, frivolous sprawl, and poor transportation infrastructure have all played into gridlock issues.

But the problems are not insurmountable.

First, the single largest commuter-group on the QEW is the West Suburb (Miss, Oakville, Burl, Hamilton) Commuter, most often bound for Toronto or another destination close to QEW Corridor.

In this case the existing GO line is the place to begin. In fairness, provincial authorities know this, now, a decade or three late, but hey...

Off-peak GO service next year jumps to every 30min, and more rush hour service is coming.

That's a start.

What is ultimately needed is service every 15 min (or better) to make it not only a viable, but an attractive option to more people.

After that, it gets more challenging.

Sprawl means that there aren't as many consolidated trip generators in one place, which makes it harder to serve them by mass transit.

Still, we can list off the large trip generators.

1) Ford Oakville
2) Any of the major hospitals
3) Mississauga City Centre
4) PIA

Those would probably be the most obvious targets for QEW corridor commuters, outside of downtown Toronto.

The first, is FORD is located right beside the GO line. This might be a candidate for a station meant for the workers, possibly with trains stopping there only at/near shift-change time.

In the case of Trillium Health, the Milton GO line comes close by, a connection via a Hurontario LRT, with integrated fares, and all-day service on Milton (all of which are coming) would seem to help this site meet its needs.

Some work should be done to better connect the Port Credit GO station as well.

MCC will be served the new LRT, but the Milton GO line needs to either get a minor realignment or a spur that allows it to get a bit closer to the action.

For commuters coming out of the south/west this trip is still a bit awkward.

Future Improvement: Use the 403 corridor to create a new GO rail line which spurs off of Lakeshore and connects to MCC.

Finally, PIA. My proposed 403 GO line could make a connection here; or alternately, the old CP tracks from Streetsville, cross the Georgetown line which passes by the airport.

Why not build a logical connecting track from the Milton line so people could take Milton trains to Union OR to PIA!

That along with merging Miss + Brampton transit into PEEL Regional Transit, and Merging Oakville + Burlington transits into Halton Region Transit so as to make for more seamless, integrated transit service including connections to GO and gridlock is mostly a memory.

:tup:

Nothing a little patience and a few billion dollars can't cure. PASS the HAT!
:)
 


Back
Top