  #1101  
Old Posted Aug 22, 2014, 5:44 PM
josef's Avatar
josef josef is offline
Registered User
 
Join Date: Aug 2003
Location: Collingswood
Posts: 876
Quote:
Originally Posted by Plokoon11 View Post
If that happens they may have to turn bf bridge into the nbc logo and Philadelphia will be called Comcastdelphia.
That's probably in their 10-year plan.

Or:

"Comcast makes, the world takes"?
__________________
South Jerseyist
Reply With Quote
     
     
  #1102  
Old Posted Aug 23, 2014, 5:51 PM
summersm343's Avatar
summersm343 summersm343 is offline
Moderator
 
Join Date: Oct 2011
Location: Philadelphia
Posts: 18,365
Image from Lincolndrive from today. Looks like the Northwest corner is to the lowest point it will go



https://www.facebook.com/BuildingPhilly
Reply With Quote
     
     
  #1103  
Old Posted Aug 24, 2014, 7:58 PM
Caruso975 Caruso975 is offline
Registered User
 
Join Date: Oct 2012
Posts: 21
Quote:
Originally Posted by summersm343 View Post
Haha no problem! If you look at some of the lots they're fitting 1,000+ footers on in NYC, I would say this lot is not out of the realm of possibility to even hold an 800+ footer, but I was told the lot can hold max 500 feet. I think this is because the regional rail tunnels that go under the site.
Notwithstanding the rumors circulating, the "grass lot" at the NEc of 18th and JFK will not be the site of a high-rise tower any time soon. It was looked at by LPT and Comcast in 2012 for a possible 7 to 17 story building, which would have been designed by Robert A.M. Stern, however due to an increase in Comcast's space needs and the relative cost of developing the small site, it was ultimately decided to develop way is now the CITC at 1800 Arch. Because of the relative cost of developing the 18th and JFK pad site, future Comcast growth will likely occur elsewhere.
Reply With Quote
     
     
  #1104  
Old Posted Aug 24, 2014, 8:12 PM
summersm343's Avatar
summersm343 summersm343 is offline
Moderator
 
Join Date: Oct 2011
Location: Philadelphia
Posts: 18,365
Quote:
Originally Posted by Caruso975 View Post
Notwithstanding the rumors circulating, the "grass lot" at the NEc of 18th and JFK will not be the site of a high-rise tower any time soon. It was looked at by LPT and Comcast in 2012 for a possible 7 to 17 story building, which would have been designed by Robert A.M. Stern, however due to an increase in Comcast's space needs and the relative cost of developing the small site, it was ultimately decided to develop way is now the CITC at 1800 Arch. Because of the relative cost of developing the 18th and JFK pad site, future Comcast growth will likely occur elsewhere.
Makes sense! And I would rather other locations be developed first, since this lot is not really an eye sore. The parking lots at 19th and Arch and the 1900 block of Arch would be nice to have developed. I know Liberty was looking into an office tower at the Northwest corner of 19th and Arch and I was told this is still on the tables. Is this the case? I work in residential and not commercial so my info on the commercial side is limited at best to rumors and information passed down.
Reply With Quote
     
     
  #1105  
Old Posted Aug 25, 2014, 11:23 PM
Parkway's Avatar
Parkway Parkway is offline
Registered User
 
Join Date: Oct 2007
Location: Philadelphia
Posts: 905
I walk past this site everyday going to work and this is sums up the hole nicely

Ok I am giving up on embedding this video https://www.youtube.com/watch?v=PzZ4i8aWs_s
__________________
"It's like a giant ball of peanut butter with a stick of Dynamite in the middle."

Last edited by Parkway; Aug 26, 2014 at 12:30 AM.
Reply With Quote
     
     
  #1106  
Old Posted Aug 25, 2014, 11:25 PM
Plokoon11 Plokoon11 is offline
Registered User
 
Join Date: Jun 2007
Posts: 1,698
Video isn't working .
Reply With Quote
     
     
  #1107  
Old Posted Aug 25, 2014, 11:54 PM
Philly Fan Philly Fan is offline
Registered User
 
Join Date: Feb 2013
Posts: 2,480
Quote:
Originally Posted by Plokoon11 View Post
Video isn't working .
Maybe that's his point--it's like looking at a blank screen.
Reply With Quote
     
     
  #1108  
Old Posted Aug 26, 2014, 12:02 AM
Plokoon11 Plokoon11 is offline
Registered User
 
Join Date: Jun 2007
Posts: 1,698
^ Haha that does make sense now when you think about it But I wasn't sure if he was out today video taping the site and the whole area ect.
Reply With Quote
     
     
  #1109  
Old Posted Aug 26, 2014, 12:08 AM
chris08876's Avatar
chris08876 chris08876 is offline
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 45,822
Patience is a virtue.
Reply With Quote
     
     
  #1110  
Old Posted Aug 26, 2014, 8:25 PM
Plokoon11 Plokoon11 is offline
Registered User
 
Join Date: Jun 2007
Posts: 1,698
It looks like there drilling something like a pillar type hole?
Reply With Quote
     
     
  #1111  
Old Posted Aug 26, 2014, 9:16 PM
summersm343's Avatar
summersm343 summersm343 is offline
Moderator
 
Join Date: Oct 2011
Location: Philadelphia
Posts: 18,365
Can someone get a picture for us?
Reply With Quote
     
     
  #1112  
Old Posted Aug 26, 2014, 9:18 PM
Plokoon11 Plokoon11 is offline
Registered User
 
Join Date: Jun 2007
Posts: 1,698
Its via webcam, so I'm not quite sure, its a tiny bit away where the machine would usually be drilling the I beams in for the retention wall.
Reply With Quote
     
     
  #1113  
Old Posted Aug 27, 2014, 1:51 PM
Mappy Mappy is offline
Registered User
 
Join Date: Apr 2012
Posts: 259
It would be apropos if post #1121 is the one officially moving it to Under Construction
Reply With Quote
     
     
  #1114  
Old Posted Aug 27, 2014, 1:59 PM
Plokoon11 Plokoon11 is offline
Registered User
 
Join Date: Jun 2007
Posts: 1,698
Well it looks like via webcam that it wasn't footer related, but the south west end of the lot is a huge mystery and the deepest part so far and the webcam cuts off down there, so maybe they could be doing that? Where is Londonee when we need him haha.
Reply With Quote
     
     
  #1115  
Old Posted Aug 27, 2014, 7:16 PM
Londonee Londonee is offline
Registered User
 
Join Date: Aug 2005
Location: Fitler Square (via London)
Posts: 2,048
Quote:
Originally Posted by Plokoon11 View Post
Well it looks like via webcam that it wasn't footer related, but the south west end of the lot is a huge mystery and the deepest part so far and the webcam cuts off down there, so maybe they could be doing that? Where is Londonee when we need him haha.
There's quite a bit of glare in the afternoon sun, so the photos are rubbish. Will wait a bit and re-take so you call can get a good forensic look. I will tell you there are large metal tubular casings now on site.
Reply With Quote
     
     
  #1116  
Old Posted Aug 27, 2014, 7:28 PM
Philly Fan Philly Fan is offline
Registered User
 
Join Date: Feb 2013
Posts: 2,480
Quote:
Originally Posted by Londonee View Post
I will tell you there are large metal tubular casings now on site.
And the caissons
Go rolling
Alooooong.
Reply With Quote
     
     
  #1117  
Old Posted Aug 27, 2014, 9:13 PM
GarCastle GarCastle is offline
Registered User
 
Join Date: Feb 2006
Posts: 469
Which corner would they tie into Suburban Station, etc.? Would they dig that out deeper initially or would that be after some initial permanent work was done?

They also have to tie into heavy duty utilities so it will be interesting to see where they did for all of that.

Cheers,
G.
__________________
"I don't need the city, it never cared for me." - Neuroticfish.
Reply With Quote
     
     
  #1118  
Old Posted Aug 27, 2014, 9:16 PM
Plokoon11 Plokoon11 is offline
Registered User
 
Join Date: Jun 2007
Posts: 1,698
I think they did that already? I'm thinking if they put up the retention wall right?
Reply With Quote
     
     
  #1119  
Old Posted Aug 28, 2014, 6:18 AM
Flyers2001 Flyers2001 is offline
Registered User
 
Join Date: Aug 2012
Posts: 856
Quote:
Originally Posted by GarCastle View Post
Which corner would they tie into Suburban Station, etc.? Would they dig that out deeper initially or would that be after some initial permanent work was done?

They also have to tie into heavy duty utilities so it will be interesting to see where they did for all of that.

Cheers,
G.
The corner that would make most sense to tie into Suburban would be Southeast which is still basically at street level.
Reply With Quote
     
     
  #1120  
Old Posted Aug 28, 2014, 9:28 PM
Jawnadelphia's Avatar
Jawnadelphia Jawnadelphia is online now
Registered User
 
Join Date: May 2014
Location: Wilmington, Delaware
Posts: 2,800


See the little guy in the bright jacket... gives proper perspective to how deep they are in that corner.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture
Forum Jump



Forum Jump


All times are GMT. The time now is 5:28 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.