9th floor slabs installed on east side which will effectively be the roof of the east side section. The 9th floor walls on the west side will be the start of the main tower.
Good progress on the 13th residential floor walls this past week. Might be setting the 14th floor slabs by end of week. Also now making progress on exterior of podium base with brick work.
Almost finished the 13th residential floor and a lot of the 14th floor slabs are also installed. Exterior brick on podium base continues now on west side.