Arrow SEATTLE | 2000 3rd Avenue | 440 FT | 43 FLOORS

Project is back from being on hold:
---------------------------------------

Rendering:



PDF: http://www.seattle.gov/dpd/AppDocs/G...endaID2815.pdf

Current Status:


Credit: Steve W @ SSC
=======================
Note: PDF contains tons of renderings, information on floors/height, impact on street, traffic, ect
Reply With Quote
     
     
  #2  
Old Posted Nov 3, 2014, 8:02 AM
chris08876's Avatar
chris08876 chris08876 is online now
ψ Sailor of the Mind ψ
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 35,133
Recent Permit Info:

Quote:
10/06/2014
Permit Issued

(2) SIDE SEWER INSTALLATIONS (CONNECT TO EX SS LATERALS) AND INSTALL STORM DRAIN (CONNECT TO EX SS LATERAL). EVAL/CERT & LINE. NO BLDG CONNECTIONS. ASSOC BLDG PERMIT 6105330. 10/6/14 JCB; ADD WORK IN ROW.
==============================
http://www.seattle.gov/dpd/toolsreso...00%203RD%20AVE
Reply With Quote
     
     
  #3  
Old Posted Nov 3, 2014, 4:17 PM
mhays mhays is offline
Registered User
 
Join Date: Jul 2001
Posts: 18,068
When the revised shoring permit is granted, that will be a better sign. http://web1.seattle.gov/DPD/permitst...spx?id=6434170

In the meantime, the developer told a reporter that the current work is very preliminary, and doesn't mean the project is happening.
__________________
"Everyday" as one word means "ordinary."
You probably mean "every day."
Reply With Quote
     
     
  #4  
Old Posted Jul 30, 2017, 9:59 PM
chris08876's Avatar
chris08876 chris08876 is online now
ψ Sailor of the Mind ψ
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 35,133
Reply With Quote
     
     
  #5  
Old Posted Oct 10, 2018, 10:41 AM
chris08876's Avatar
chris08876 chris08876 is online now
ψ Sailor of the Mind ψ
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 35,133
Reply With Quote
     
     
  #6  
Old Posted Oct 11, 2018, 8:21 PM
mhays mhays is offline
Registered User
 
Join Date: Jul 2001
Posts: 18,068
Meanwhile the developer has recently started four other towers (two each at 1200 Stewart and 707 Terry), and they're building a sales center on the 2000 3rd site for use until the site is needed, which is probably mid-2019 at earliest.
__________________
"Everyday" as one word means "ordinary."
You probably mean "every day."
Reply With Quote
     
     
  #7  
Old Posted Oct 12, 2018, 3:50 AM
BonoboZill4's Avatar
BonoboZill4 BonoboZill4 is offline
Registered User
 
Join Date: Aug 2018
Location: PingPong
Posts: 1,588
I like the previous design more tbh, but keeping the massive platform at the top is nice
__________________
I'm here for a long time, not a good time
Reply With Quote
     
     
  #8  
Old Posted Oct 12, 2018, 6:26 PM
Zerton's Avatar
Zerton Zerton is offline
Ω
 
Join Date: Mar 2002
Location: Chicago
Posts: 4,416
The biodome is now a biocube.
__________________
If all others accepted the lie which the Party imposed, if all records told the same tale, then the lie passed into history and became truth. -Orwell
Reply With Quote
     
     
  #9  
Old Posted Oct 28, 2018, 2:36 AM
chris08876's Avatar
chris08876 chris08876 is online now
ψ Sailor of the Mind ψ
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 35,133
The sales office.


Credit: geoffloftus
Reply With Quote
     
     
  #10  
Old Posted Oct 30, 2018, 4:17 AM
mhays mhays is offline
Registered User
 
Join Date: Jul 2001
Posts: 18,068
It's a sales office for two other projects by the same developer, both digging, which will include condos in some portion of:
--Twin 44-story towers at 1200 Stewart
--Twin 30-story towers at 707 Terry
--I'm sure they'll be able to talk about this one too, but generally sales offices need to be at least relocatable (is this?) to somewhere offsite so they aren't torn down 30 months before the building opens.
__________________
"Everyday" as one word means "ordinary."
You probably mean "every day."
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Global Projects & Construction > Proposals
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 3:42 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2020, vBulletin Solutions, Inc.