HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Discussion Forums > Transportation


Reply

 
Thread Tools Display Modes
     
     
  #661  
Old Posted Jul 24, 2020, 11:16 PM
mhays mhays is online now
Never Dell
 
Join Date: Jul 2001
Posts: 19,786
Federal Way Link has broken ground, extending Seattle's existing light rail line three stops further south.

https://www.soundtransit.org/system-...n/news-updates

This flyover is pretty good. https://youtu.be/dHH5Nthscek

Edit:

Also the Redmond extension is underway, extending beyond the East Link the year after it opens. https://www.soundtransit.org/system-...n/news-updates

And the Lynnwood extension is underway, extending beyond Northgate a couple years after that opens. https://www.soundtransit.org/system-...n/news-updates

Last edited by mhays; Jul 24, 2020 at 11:33 PM.
Reply With Quote
     
     
  #662  
Old Posted Jul 24, 2020, 11:59 PM
Busy Bee's Avatar
Busy Bee Busy Bee is online now
Show me the blueprints
 
Join Date: Feb 2006
Location: on the artistic spectrum
Posts: 10,336
^Good stuff.

Though I have always felt that American light rail projects tends to over rely on aerial structures where trench cuts and underpasses would be much more aesthetically pleasing and long-term sustainable. This is often the practice in Europe with stronger land use standards and a finer tuned cultural investment in low-impact design but often American projects that are at the whim of a political term often are engineered by the lowest common denominator, even if that means it's ugly and/or you're tearing it down and rebuilding it in 50 years.
__________________
Everything new is old again

There is no goodness in him, and his power to convince people otherwise is beyond understanding
Reply With Quote
     
     
  #663  
Old Posted Jul 25, 2020, 5:08 AM
electricron's Avatar
electricron electricron is offline
Registered User
 
Join Date: Aug 2008
Location: Granbury, Texas
Posts: 3,523
Lightbulb

Quote:
Originally Posted by Busy Bee View Post
^Good stuff.

Though I have always felt that American light rail projects tends to over rely on aerial structures where trench cuts and underpasses would be much more aesthetically pleasing and long-term sustainable. This is often the practice in Europe with stronger land use standards and a finer tuned cultural investment in low-impact design but often American projects that are at the whim of a political term often are engineered by the lowest common denominator, even if that means it's ugly and/or you're tearing it down and rebuilding it in 50 years.
Have any modern light rail projects in the USA been torn down and rebuilt in the last 50 years? 60 years? 70 years? Vehicles have been replaced, but have any elevated light rail structures been replaced?
Reply With Quote
     
     
  #664  
Old Posted Jul 25, 2020, 5:27 AM
Busy Bee's Avatar
Busy Bee Busy Bee is online now
Show me the blueprints
 
Join Date: Feb 2006
Location: on the artistic spectrum
Posts: 10,336
Well there aren't any light rail aerial structures that old yet. I don't have much doubt though that many recent light rail aerials and grade separation flyovers made of concrete probably will have to be rebuilt after they reach 50 years old.
__________________
Everything new is old again

There is no goodness in him, and his power to convince people otherwise is beyond understanding
Reply With Quote
     
     
  #665  
Old Posted Jul 25, 2020, 7:31 AM
electricron's Avatar
electricron electricron is offline
Registered User
 
Join Date: Aug 2008
Location: Granbury, Texas
Posts: 3,523
Lightbulb

Quote:
Originally Posted by Busy Bee View Post
Well there aren't any light rail aerial structures that old yet. I don't have much doubt though that many recent light rail aerials and grade separation flyovers made of concrete probably will have to be rebuilt after they reach 50 years old.
Maybe they will, maybe they will not. Like you say, it is too early to know.
Never-the-less, with transit tracks within cuts, roads and other things are built over them - and guess what do you think most are constructed with, the same concrete used by transit systems.
So either way, 50 years afterwards will determine which is better, replacing light rail flyovers or street flyovers, assuming all will need to be replaced.
Reply With Quote
     
     
  #666  
Old Posted Jul 25, 2020, 12:13 PM
Busy Bee's Avatar
Busy Bee Busy Bee is online now
Show me the blueprints
 
Join Date: Feb 2006
Location: on the artistic spectrum
Posts: 10,336
It's a lot easier to replace a roadway bridge over an open cut than it is to shut down a rail line to replace its own r.o.w. bridge over a roadway.
__________________
Everything new is old again

There is no goodness in him, and his power to convince people otherwise is beyond understanding
Reply With Quote
     
     
  #667  
Old Posted Jul 25, 2020, 5:05 PM
mhays mhays is online now
Never Dell
 
Join Date: Jul 2001
Posts: 19,786
Light rail in Seattle is generally more difficult than the Federal Way extension. Usually it involves creating new ROW vs. the easy freeway margin. Tunnels, bridges, and steep slopes are common. Building in dense neighborhoods is common. Two stretches of the current line have street crossings, which is also a capacity and speed issue. I shudder to think about retrofits or rebuildings in 50 years or whenever. That would probably involve all-new ROW because the existing lines are already in tight places.

We have a long history of public works needing to be replaced or heavily retrofitted. The West Seattle Bridge (freeway) is in a two-year closure due to potential failure, and that's if it can be retrofitted. We've recently replaced the 520 floating bridge because the old one was at the end of its lifespan. We recently replaced SR99 through Downtown with a new deep tunnel mostly because the waterfront viaduct was a seismic risk. The Magnolia Bridge was temporarily closed and seismically upgraded after a landslide weakened it, and it'll need to be replaced. The Kingdome had a roof tile issue that required temporary closure and massive work.

We've also had disasters not averted. One of the I-90 floating bridges on Lake Washington sank during another refurbishment (air tanks left open during a holiday weekend). The Hood Canal floating bridge failed in a storm with people on it. The Tacoma Narrows suspension bridge failed in a storm with people on it.

That said, the design and construction professions know more today than they used to. Forces and time can be modeled far more accurately. Sometimes that means reducing material use and using new designs (potentially introducing new risks), but I suspect that even then the result will be longer lifespans, particularly for public work that's designed to high lifespan standards.
Reply With Quote
     
     
  #668  
Old Posted Jul 26, 2020, 4:14 AM
jamesinclair jamesinclair is offline
Registered User
 
Join Date: Dec 2005
Posts: 865
Quote:
Originally Posted by electricron View Post
Have any modern light rail projects in the USA been torn down and rebuilt in the last 50 years? 60 years? 70 years? Vehicles have been replaced, but have any elevated light rail structures been replaced?
In Boston, the green line is being extended, which requires shifting a portion of track. As part of that work, they are removing more of the elevated viaduct than needed to build it new. They are also using the time to repair the rest of the viaduct.
Reply With Quote
     
     
  #669  
Old Posted Jul 26, 2020, 5:07 AM
electricron's Avatar
electricron electricron is offline
Registered User
 
Join Date: Aug 2008
Location: Granbury, Texas
Posts: 3,523
Lightbulb

Quote:
Originally Posted by jamesinclair View Post
In Boston, the green line is being extended, which requires shifting a portion of track. As part of that work, they are removing more of the elevated viaduct than needed to build it new. They are also using the time to repair the rest of the viaduct.
The Green Line is a light rail system run by the Massachusetts Bay Transportation Authority (MBTA) in the Boston, Massachusetts, metropolitan area. It is the oldest Boston rapid transit line, and with tunnel sections dating from 1897, the oldest in America. It runs as a deep-level subway through downtown Boston, and on the surface into inner suburbs via four branches on several radial boulevards. It crosses the Charles River on the Lechmere Viaduct built in 1912, over 100 years ago. It's other major elevated section is the Highland Branch of the D branch, a former commuter rail line.

The first section of what became the Highland branch was built by the Boston and Worcester Railroad between Boston and Brookline in 1848. The Charles River Branch Railroad, a forerunner of the New York and New England Railroad, extended the line to Newton Upper Falls in 1852. The B&A bought the line in 1883 and extended to Riverside, rejoining its main line there. The line was closed in 1958 and sold to the Metropolitan Transit Authority (MTA), which reopened it in 1959 as a light rail line. 1883 is almost 140 years ago, and 1959 is just over 60 years ago.

MBTA is just now rebuilding bridges and viaducts built over 100 years ago. That's significantly longer than 50 years.
Reply With Quote
     
     
  #670  
Old Posted Jul 26, 2020, 12:48 PM
Busy Bee's Avatar
Busy Bee Busy Bee is online now
Show me the blueprints
 
Join Date: Feb 2006
Location: on the artistic spectrum
Posts: 10,336
The Boston Green Line has zero to do with the kind of recent LRT infrastructure I am referring to....come on man. I'm talking about the dozens of concrete overpasses you see on the "rollercoasters" like LA Expo Line, Charlotte Blue Line, and the aerial structures like these in Seattle.
__________________
Everything new is old again

There is no goodness in him, and his power to convince people otherwise is beyond understanding
Reply With Quote
     
     
  #671  
Old Posted Jul 27, 2020, 7:13 PM
Cirrus's Avatar
Cirrus Cirrus is offline
cities|transit|croissants
 
Join Date: Jul 2001
Location: Washington, DC
Posts: 18,378
Thanks. I added the Seattle extensions. For now all the Seattle projects are listed combined as a single bullet point. If someone would care to work out exactly how to list each individually, I'd be happy to edit.
__________________
writing | twitter | flickr | instagram | ssp photo threads
Reply With Quote
     
     
  #672  
Old Posted Sep 1, 2020, 2:55 PM
muertecaza muertecaza is offline
Registered User
 
Join Date: Oct 2015
Posts: 2,227
The Phoenix Northwest Phase 2 light rail extension is now under construction.

https://www.valleymetro.org/project/...e-ii-extension
Reply With Quote
     
     
  #673  
Old Posted Sep 22, 2020, 2:22 AM
Tcmetro Tcmetro is offline
Registered User
 
Join Date: Jul 2010
Posts: 105
The N Line in Denver has opened today:
https://www.rtd-denver.com/fastracks/n-line

This is likely the last new rail line opening in the US in 2020. It is possible (but seems unlikely) that Canada's GO Transit extension on the Richmond Hill line to Bloomington Rd will open. Metrolinx hasn't provided an update on the project in a while.
Reply With Quote
     
     
  #674  
Old Posted Sep 23, 2020, 2:37 AM
Cirrus's Avatar
Cirrus Cirrus is offline
cities|transit|croissants
 
Join Date: Jul 2001
Location: Washington, DC
Posts: 18,378
Phoenix added and Denver moved to complete.

2020 will be by-far the least active year in terms of openings since I began compiling this list in 2012.
__________________
writing | twitter | flickr | instagram | ssp photo threads
Reply With Quote
     
     
  #675  
Old Posted Sep 26, 2020, 12:44 PM
Tcmetro Tcmetro is offline
Registered User
 
Join Date: Jul 2010
Posts: 105
Here's what I have found for 2021 rail openings in US/Canada. A number of these projects have been postponed into 2021, so it will be nice to see them finally open.

Cirrus, I also noticed that the SMART Larkspur extension is listed in the first page run-down. That project opened in December 2019. They do have a new extension underway, north to Windsor. It's about 3 miles in length.
http://sonomamarintrain.org/construction-updates

Last edited by Tcmetro; Sep 26, 2020 at 12:55 PM.
Reply With Quote
     
     
  #676  
Old Posted Sep 27, 2020, 2:33 AM
Cirrus's Avatar
Cirrus Cirrus is offline
cities|transit|croissants
 
Join Date: Jul 2001
Location: Washington, DC
Posts: 18,378
Edited to reflect SMART. Thanks!
__________________
writing | twitter | flickr | instagram | ssp photo threads
Reply With Quote
     
     
  #677  
Old Posted Oct 17, 2020, 10:43 PM
Easy's Avatar
Easy Easy is offline
Registered User
 
Join Date: Dec 2004
Location: Los Angeles, CA
Posts: 1,575
Quote:
Originally Posted by Busy Bee View Post
It's a lot easier to replace a roadway bridge over an open cut than it is to shut down a rail line to replace its own r.o.w. bridge over a roadway.
I don't think what you're advocating is very easy. If you cut through a major street instead of going over it, where do you put the sewer lines? Water lines? Electrical and phone lines? Realistically the only options are to either go over utilities or go under them, which would mean a tunnel, not a cut.
Reply With Quote
     
     
  #678  
Old Posted Oct 29, 2020, 3:25 PM
OhioGuy OhioGuy is offline
Registered User
 
Join Date: Jul 2004
Location: DC
Posts: 7,652
Construction has begun in Northern Indiana on a new branch to the South Shore train.

https://abc7chicago.com/travel/south...y-ind/7449680/
Reply With Quote
     
     
  #679  
Old Posted Nov 9, 2020, 1:42 PM
Innsertnamehere's Avatar
Innsertnamehere Innsertnamehere is online now
Registered User
 
Join Date: Jan 2010
Location: Hamilton
Posts: 11,565
I drove by the new GO station in Toronto for the Richmond Hill line on Saturday and it looked almost complete. If it doesn't open by the end of this year it will be early 2021.
Reply With Quote
     
     
  #680  
Old Posted Dec 16, 2020, 7:16 PM
202_Cyclist's Avatar
202_Cyclist 202_Cyclist is offline
Registered User
 
Join Date: Feb 2009
Posts: 5,934
Orange County streetcar

We took this trip to Garden Grove
It smelled like Lou-dog inside the streetcar, oh yeah...


The first section of track has been inserted for the Orange County streetcar.





Photos courtesy of City of Santa Ana's Twitter feed.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Discussion Forums > Transportation
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 5:31 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.