  #21  
Old Posted Jan 1, 2020, 3:33 PM
MPLS_Const_Watch MPLS_Const_Watch is offline
Registered User
 
Join Date: Mar 2018
Posts: 678
12/31.

     
     
  #22  
Old Posted Jan 3, 2020, 11:53 PM
MPLS_Const_Watch MPLS_Const_Watch is offline
Registered User
 
Join Date: Mar 2018
Posts: 678
1/3.

     
     
  #23  
Old Posted Jan 9, 2020, 2:09 AM
MPLS_Const_Watch MPLS_Const_Watch is offline
Registered User
 
Join Date: Mar 2018
Posts: 678
Updated plans: http://minneapolismn.gov/www/groups/...msp-222343.pdf .

Remains 21 floors. Reduced in height by 9' to 247', units reduced by 9 to 346. Increased floor area, removed the third basement level of parking.

From the new plans:











     
     
  #24  
Old Posted Jan 10, 2020, 1:27 AM
MPLS_Const_Watch MPLS_Const_Watch is offline
Registered User
 
Join Date: Mar 2018
Posts: 678
1/9.

     
     
  #25  
Old Posted Jan 14, 2020, 11:35 PM
MPLS_Const_Watch MPLS_Const_Watch is offline
Registered User
 
Join Date: Mar 2018
Posts: 678
1/14.

     
     
  #26  
Old Posted Jan 24, 2020, 1:25 AM
MPLS_Const_Watch MPLS_Const_Watch is offline
Registered User
 
Join Date: Mar 2018
Posts: 678
1/23.

Crane base is in. They have also been breaking up limestone in a grid of pads on the site, not sure what those are for exactly. Caisson sleeves are back on site as well. Should see both the crane go up and caisson drilling for the building begin shortly.

     
     
  #27  
Old Posted Jan 28, 2020, 1:49 AM
MPLS_Const_Watch MPLS_Const_Watch is offline
Registered User
 
Join Date: Mar 2018
Posts: 678
From the webcam today, 1/27, it looks like they've now drilled the first caisson.

     
     
  #28  
Old Posted Jan 31, 2020, 2:43 AM
MPLS_Const_Watch MPLS_Const_Watch is offline
Registered User
 
Join Date: Mar 2018
Posts: 678
1/30.

     
     
  #29  
Old Posted Feb 4, 2020, 12:37 PM
MPLS_Const_Watch MPLS_Const_Watch is offline
Registered User
 
Join Date: Mar 2018
Posts: 678
2/3.

Crane is up. (white crane in background; cranes in foreground are for RBC Gateway )



     
     
  #30  
Old Posted Feb 5, 2020, 12:15 AM
MPLS_Const_Watch MPLS_Const_Watch is offline
Registered User
 
Join Date: Mar 2018
Posts: 678
2/4.

     
     
  #31  
Old Posted Feb 14, 2020, 12:24 AM
MPLS_Const_Watch MPLS_Const_Watch is offline
Registered User
 
Join Date: Mar 2018
Posts: 678
2/13.

This is one of the taller buildings we've seen this cycle that has been constructed primarily on pad footings rather than caissons. I think the Expo is the tallest we've seen.

     
     
  #32  
Old Posted Feb 22, 2020, 2:50 AM
MPLS_Const_Watch MPLS_Const_Watch is offline
Registered User
 
Join Date: Mar 2018
Posts: 678
2/21.

Lots of progress in the last week on exterior walls, shear walls, and columns for the first garage level.



     
     
  #33  
Old Posted Mar 2, 2020, 10:55 PM
MPLS_Const_Watch MPLS_Const_Watch is offline
Registered User
 
Join Date: Mar 2018
Posts: 678
3/2.

Lots of progress. Main core pad is in place. First sections of formwork for 2nd garage level going in at the NE corner of the site.



     
     
  #34  
Old Posted Jul 31, 2020, 5:25 AM
MPLS_Const_Watch MPLS_Const_Watch is offline
Registered User
 
Join Date: Mar 2018
Posts: 678
7/30.







     
     
  #35  
Old Posted Aug 11, 2020, 3:47 PM
MPLS_Const_Watch MPLS_Const_Watch is offline
Registered User
 
Join Date: Mar 2018
Posts: 678
Looks like they've been holding pretty steady at 8-10 days per floor. Topping out in mid to late November?
     
     
  #36  
Old Posted Aug 11, 2020, 3:49 PM
MPLS_Const_Watch MPLS_Const_Watch is offline
Registered User
 
Join Date: Mar 2018
Posts: 678
Just realized I never posted my photos of this one from last week.

8/5:







     
     
  #37  
Old Posted Aug 19, 2020, 2:32 AM
MPLS_Const_Watch MPLS_Const_Watch is offline
Registered User
 
Join Date: Mar 2018
Posts: 678
8/18.







     
     
  #38  
Old Posted Aug 29, 2020, 2:19 AM
MPLS_Const_Watch MPLS_Const_Watch is offline
Registered User
 
Join Date: Mar 2018
Posts: 678
8/22.

A bit of glass! And a bit of humvee!



     
     
  #39  
Old Posted Sep 14, 2020, 11:31 PM
MPLS_Const_Watch MPLS_Const_Watch is offline
Registered User
 
Join Date: Mar 2018
Posts: 678
9/14:





     
     
  #40  
Old Posted Sep 30, 2020, 2:19 PM
jla1591 jla1591 is offline
Registered User
 
Join Date: Nov 2015
Posts: 161
This one is going up fast. Adding more glass everyday.

     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
 

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture > Completed Project Threads Archive
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 7:39 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.