HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan


Reply

 
Thread Tools Display Modes
     
     
  #1641  
Old Posted Jun 16, 2016, 2:47 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 13,782
^ Yeah we'll see what the TNS parkade looks like.

Photo from the construction cam this morning. Non changing photo . I will assume the wooden frame will be lowered into the hole as forms for a crane base. That hole is quite deep.

Reply With Quote
     
     
  #1642  
Old Posted Jun 16, 2016, 3:14 PM
robertocarlos robertocarlos is offline
Registered User
 
Join Date: Jul 2015
Posts: 820
Just a block away the water table only allowed a one story parking garage. That hole is deep enough for a four level parking garage.
Reply With Quote
     
     
  #1643  
Old Posted Jun 16, 2016, 3:18 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 13,782
Ya no kidding. I'm just guessing on this too. But it would make sense they would put the tower crane foundation below the bottom of the parkade. So they could leave it in place once construction is complete, buried below the lower level of the parkade.
Reply With Quote
     
     
  #1644  
Old Posted Jun 16, 2016, 3:33 PM
Cyro's Avatar
Cyro Cyro is offline
Registered User
 
Join Date: Jan 2013
Posts: 5,197
Quote:
Originally Posted by robertocarlos View Post
Just a block away the water table only allowed a one story parking garage.
Quote:
Originally Posted by Cyro View Post
2 levels, 228 stalls.

Tower 1


http://www.truenorthsquare.com/devel...-availability/

-2 Level Underground Parkade:
-3 floors of Podium all leased.
-1 Level above podium leased
-Floors 13-17 leased.
When did it change to 1 level of parking?
__________________
♥ ♥
Reply With Quote
     
     
  #1645  
Old Posted Jun 16, 2016, 3:34 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 13,782
^Hydro building only has one level due to the water table, from what's been said on here. TNS still has two.
Reply With Quote
     
     
  #1646  
Old Posted Jun 16, 2016, 3:37 PM
Cyro's Avatar
Cyro Cyro is offline
Registered User
 
Join Date: Jan 2013
Posts: 5,197
Quote:
Originally Posted by bomberjet View Post
^ Yeah we'll see what the TNS parkade looks like.

Photo from the construction cam this morning. Non changing photo . I will assume the wooden frame will be lowered into the hole as forms for a crane base. That hole is quite deep.


Pretty much bang on, from earlier suggestions on crane placement...
__________________
♥ ♥
Reply With Quote
     
     
  #1647  
Old Posted Jun 16, 2016, 3:44 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 13,782
haha I love the dancing bananas. Again, I assume that's what they're doing with that hole.
Reply With Quote
     
     
  #1648  
Old Posted Jun 16, 2016, 4:24 PM
Cyro's Avatar
Cyro Cyro is offline
Registered User
 
Join Date: Jan 2013
Posts: 5,197
The boys on site are hanging out around their framework @ 8:21am (image), we'll see how quick they can get it in by the end of the day..
__________________
♥ ♥
Reply With Quote
     
     
  #1649  
Old Posted Jun 16, 2016, 8:12 PM
cllew cllew is offline
Registered User
 
Join Date: Feb 2012
Posts: 3,991
Quote:
Originally Posted by robertocarlos View Post
Just a block away the water table only allowed a one story parking garage. That hole is deep enough for a four level parking garage.
go one block south and the Delta Hotel complex has a multi level underground parking lot. And the underground at Portage Place is two levels if I am not mistaken.

Not sure why the Hydro Building was not able to do at least the same as those two other buildings.
Reply With Quote
     
     
  #1650  
Old Posted Jun 16, 2016, 8:43 PM
Biff's Avatar
Biff Biff is online now
What could go wrong?
 
Join Date: Jun 2004
Location: Winnipeg
Posts: 8,744
Sorry, you guys no nothing about construction sites. True North likes things kept neat. That is clearly a raised cedar planter box. You can buy them at Home Depot. I think I heard Petunias and Marigolds.
__________________
"But a city can be smothered by too much reverence for its past. The skyline must keep acquiring new peaks, because the day we consider it complete and untouchable is the day the city begins to die." - Justin Davidson - May 2010 Issue of New York
Reply With Quote
     
     
  #1651  
Old Posted Jun 16, 2016, 8:43 PM
esquire's Avatar
esquire esquire is offline
Registered User
 
Join Date: Oct 2001
Posts: 37,483
Quote:
Originally Posted by cllew View Post
go one block south and the Delta Hotel complex has a multi level underground parking lot. And the underground at Portage Place is two levels if I am not mistaken.

Not sure why the Hydro Building was not able to do at least the same as those two other buildings.
The conventional wisdom on that subject which has been cited numerous times is that apparently the meat packing plants in St. Boniface drew so much water from wells for years that it kept the water table in the city down and made those deep parking pits possible... now, no more meat packing plants, no more deep parkades. Someone mentioned that the Delta (Lakeview Square) has pumps running continuously to keep the parkade dry? (What happens if there's a prolonged blackout?)
Reply With Quote
     
     
  #1652  
Old Posted Jun 16, 2016, 9:53 PM
Jack1983 Jack1983 is offline
Registered User
 
Join Date: Dec 2009
Location: Winnipeg
Posts: 121
Manitoba Hydro Place Parkade

Quote:
Originally Posted by cllew View Post
go one block south and the Delta Hotel complex has a multi level underground parking lot. And the underground at Portage Place is two levels if I am not mistaken.

Not sure why the Hydro Building was not able to do at least the same as those two other buildings.
I recall reading somewhere that part of the rational for only putting in one parkade level had something to do with the Leed Platinum Certification that Manitoba Hydro Place was chasing.

If two levels were put it, it likely would have been manageable; however more dewatering of sumps in the parkade would be required. Thus increasing the energy use of the building.
Reply With Quote
     
     
  #1653  
Old Posted Jun 17, 2016, 12:34 AM
blueandgoldguy blueandgoldguy is offline
Registered User
 
Join Date: Jul 2012
Posts: 2,760
Quote:
Originally Posted by bomberjet View Post
^ Yeah we'll see what the TNS parkade looks like.

Photo from the construction cam this morning. Non changing photo . I will assume the wooden frame will be lowered into the hole as forms for a crane base. That hole is quite deep.

I wonder what that approx. 20 * 20 foot wooden structure they are building in the bottom-left corner is?
Reply With Quote
     
     
  #1654  
Old Posted Jun 17, 2016, 3:10 AM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 13,782
It appears it will be put into the bottom of that hole, for a tower crane base potentially.
Reply With Quote
     
     
  #1655  
Old Posted Jun 17, 2016, 7:32 AM
cllew cllew is offline
Registered User
 
Join Date: Feb 2012
Posts: 3,991
You can't see it from the picture but there are 4 piles in a square pattern with exposed rebar sticking out in the hole they dug.

When I come back to work next week I would not be surprised to see the tower base with the bolts right in the middle of the piles.
Reply With Quote
     
     
  #1656  
Old Posted Jun 17, 2016, 2:45 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 13,782
Ah yes, you can see it in this image from last night. Hole is also squared nicely now.

Reply With Quote
     
     
  #1657  
Old Posted Jun 17, 2016, 3:41 PM
optimusREIM's Avatar
optimusREIM optimusREIM is online now
There is always a way
 
Join Date: May 2014
Location: Winnipeg
Posts: 2,856
I'm curious to find out where the other crane will be. This one seems too far from tower 1 to service the whole site. Maybe tower two starts its podium right away then follows tower one relatively quickly after it begins.
Reply With Quote
     
     
  #1658  
Old Posted Jun 17, 2016, 4:12 PM
CoryB CoryB is offline
Registered User
 
Join Date: Mar 2012
Posts: 5,892
Quote:
Originally Posted by Jack1983 View Post
I recall reading somewhere that part of the rational for only putting in one parkade level had something to do with the Leed Platinum Certification that Manitoba Hydro Place was chasing.

If two levels were put it, it likely would have been manageable; however more dewatering of sumps in the parkade would be required. Thus increasing the energy use of the building.
This sounds like it is closer to the truth than the theory on the meat packing plants causing the water table to be lower in downtown. If you could only do one level of underground parking now how did the Convention Centre expansion built after the Hydro tower accomplish their tow levels?
Reply With Quote
     
     
  #1659  
Old Posted Jun 17, 2016, 4:16 PM
esquire's Avatar
esquire esquire is offline
Registered User
 
Join Date: Oct 2001
Posts: 37,483
^ The meat packing plants could be the reason that the pumps are needed in the first place... would the Lakeview Square parkade really have gone down 6 levels (or whatever it is) if water was the same level then as it is now?
Reply With Quote
     
     
  #1660  
Old Posted Jun 17, 2016, 4:19 PM
Hecate's Avatar
Hecate Hecate is offline
Registered User
 
Join Date: Apr 2016
Posts: 1,351
I remember reading that hydro only put in the one level of parking to encourage its employees to use public transportation...
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump



Forum Jump


All times are GMT. The time now is 1:15 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.