Quote:
Originally Posted by cllew
go one block south and the Delta Hotel complex has a multi level underground parking lot. And the underground at Portage Place is two levels if I am not mistaken.
Not sure why the Hydro Building was not able to do at least the same as those two other buildings.
|
I recall reading somewhere that part of the rational for only putting in one parkade level had something to do with the Leed Platinum Certification that Manitoba Hydro Place was chasing.
If two levels were put it, it likely would have been manageable; however more dewatering of sumps in the parkade would be required. Thus increasing the energy use of the building.