http://skyscraperpage.com/cities/?buildingID=122234
Official sources:
http://www.bostonplans.org/getattach...8-3fb6f5acc465
https://archboston.com/community/thr...t.5628/page-11
Building Name:
111 Harbor Way
Coordinates (with decimal fraction):
42.35020678607512, -71.04511486497195
Heights--
- roof:
82.3M (source:
http://www.bostonplans.org/getattach...8-3fb6f5acc465 - page 2)
Current Building Status:
Built
Construction Dates--
- started:
2018
- finished:
2021
Building Materials:
Glass, Steel, Aluminum
-----------------------------------------------------
https://skyscraperpage.com/cities/?buildingID=135232
This link for 305 Western Avenue in Boston, MA is inactive and leads to the main database page rather than the building information.
-----------------------------------------------------
https://skyscraperpage.com/cities/?buildingID=131234
Official sources:
https://www.somervillema.gov/departments/planning-board (search; street: Middlesex, address: 74)
https://www.greystar.com/business-se...d-projects/74m
https://archboston.com/community/thr...le.5576/page-3
Building Name:
74M
• Architect:
Elkus|Manfredi
• Developer:
Greystar
• Floor to floor height:
4.57M
Heights--
- roof:
91.3M (source: City of Somerville Planning Board -
https://www.somervillema.gov/sites/d...20Drawings.pdf – page 17)
- top floor:
68.3M (source: City of Somerville Planning Board -
https://www.somervillema.gov/sites/d...20Drawings.pdf – page 17)
Current Building Status:
Under Construction
Construction Dates--
- started:
2021
- will finish:
2024
Above ground floors:
16
Underground floors:
4
Gross Floor area:
45,894m2
Building Style(s):
Modern
Building Materials:
Glass, metal ,aluminum, steel, wood