  #121  
Old Posted Jul 2, 2020, 8:49 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 1,816
Major concrete pour today with pump truck and lots of cement trucks queuing up.
Reply With Quote
     
     
  #122  
Old Posted Jul 5, 2020, 3:12 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 1,816
They have poured the L2 level floor slab. Will be removing the corner steel bracing soon in order to form and pour the L2 walls and posts over the coming weeks. Should be forming the L1 level floor by end of July.
Reply With Quote
     
     
  #123  
Old Posted Yesterday, 7:20 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 1,816
Given the number of Ellis-Don trucks I suspect they have been sub contracted to build this tower. Good timing as the concrete forming is now done at 515 Richmond St. Those experienced crews can move a couple of blocks south and form and pour York's 31 storey building. Old Oak is going to use Concrete Forming as contractor for their Centro project.
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > London > Projects & Construction Updates
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 5:37 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2020, vBulletin Solutions, Inc.