  #41  
Old Posted Jun 17, 2020, 10:50 AM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,783
Digging continues with horizontal cable braces being installed into pit walls.
Reply With Quote
     
     
  #42  
Old Posted Jul 15, 2020, 3:44 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,783
Going deeper now to excavate the pit for the foundation and two levels of underground parking. Would expect this to continue thru rest of summer before they start doing concrete work. The sub soils along this stretch of Talbot on the high bank over the river appear to be really sandy. Centro further south has run into ground water problems as the soil is sand. Extra engineering effort and design will be needed to secure the foundations of these buildings and protect them from ground water and shifting.
Reply With Quote
     
     
  #43  
Old Posted Jul 15, 2020, 5:40 PM
ssiguy ssiguy is offline
Registered User
 
Join Date: Mar 2006
Location: White Rock BC
Posts: 10,731
I'm lost on this building. Is this the same one going up on Ann Street or Varcity Common? It doesn't appear any where on the SSP database or map. Pics?
Reply With Quote
     
     
  #44  
Old Posted Jul 15, 2020, 9:11 PM
Djeffery Djeffery is online now
Registered User
 
Join Date: Oct 2017
Location: London
Posts: 4,534
Quote:
Originally Posted by ssiguy View Post
I'm lost on this building. Is this the same one going up on Ann Street or Varcity Common? It doesn't appear any where on the SSP database or map. Pics?
This is on the west side of Talbot between Mill and John. The site formerly called Locust Mount. Or for more familiar landmarks, go west from the Ceeps or west from The Barking Frog, until you hit Talbot and this site is right across the road lol
Reply With Quote
     
     
  #45  
Old Posted Jul 16, 2020, 4:25 AM
ssiguy ssiguy is offline
Registered User
 
Join Date: Mar 2006
Location: White Rock BC
Posts: 10,731
So there are now 5 towers under construction along Richmond Row..........this one, Ann St, Centro 1 & 2, and the Richmond one just finishing up?
Reply With Quote
     
     
  #46  
Old Posted Jul 16, 2020, 10:39 AM
Djeffery Djeffery is online now
Registered User
 
Join Date: Oct 2017
Location: London
Posts: 4,534
Quote:
Originally Posted by ssiguy View Post
So there are now 5 towers under construction along Richmond Row..........this one, Ann St, Centro 1 & 2, and the Richmond one just finishing up?
Ann St isn't happening yet, not sure when or if it's happening. I think it got a rough ride at the last stage of approval.
Reply With Quote
     
     
  #47  
Old Posted Jul 16, 2020, 10:43 AM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,783
Ann street is still in proposal stage and looking at a battle over heritage and nimbyism from the same group of anti progressives. Not likely to start any time soon if ever.



Quote:
Originally Posted by ssiguy View Post
So there are now 5 towers under construction along Richmond Row..........this one, Ann St, Centro 1 & 2, and the Richmond one just finishing up?
Reply With Quote
     
     
  #48  
Old Posted Aug 7, 2020, 12:25 AM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,783
They may have now reached the bottom of pit on south side as they are now working along the north side.
Reply With Quote
     
     
  #49  
Old Posted Aug 18, 2020, 12:55 AM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,783
Looks like they are prepping for tower crane base.
Reply With Quote
     
     
  #50  
Old Posted Aug 22, 2020, 3:38 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,783
Doing alot of steel rebar for tower crane base foundation. Have the base set and preparing the steel rebar around it. Could see a concrete pour by end of this week.
Reply With Quote
     
     
  #51  
Old Posted Aug 27, 2020, 7:47 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,783
Sign up on Talbot St about street closing starting on Sept 8th. Could be the assembly of the tower crane.
Reply With Quote
     
     
  #52  
Old Posted Sep 5, 2020, 3:15 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,783
First segments of tower crane are now up. Talbot is closed Tuesday/Wed this week for the final assembly of the tower crane. Following this should see footings started and the 2 level underground parking garage. The 12 story behind Farm Boy off Wonderland is now topped out with the last of the concrete forming completed. Those crews will likely now move to Talbot St.
Reply With Quote
     
     
  #53  
Old Posted Sep 9, 2020, 11:59 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,783
Tower crane is now up. Not set to final height for this 16s building so will need to raise it once they get up to at least the 8th floor.
Reply With Quote
     
     
  #54  
Old Posted Oct 9, 2020, 11:19 AM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,783
Nothing done to date on the foundation for this project since the crane went up. Surprising they didn't move quickly to get the footings dug and poured while the good weather was here.
Reply With Quote
     
     
  #55  
Old Posted Oct 14, 2020, 2:54 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,783
Good to see some actual progress starting this week. Sidewalk walkway cover being installed and some forming started in the pit.
Reply With Quote
     
     
  #56  
Old Posted Oct 17, 2020, 2:49 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,783
They have started the foundation along the south wall of pit. Steel rebar is in for the footings.
Reply With Quote
     
     
  #57  
Old Posted Nov 13, 2020, 4:24 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,783
Have poured some of the L2 walls now.
Reply With Quote
     
     
  #58  
Old Posted Dec 9, 2020, 5:44 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,783
Have formed and poured about a dozen L2 posts and footings now. Some more of the L2 exterior walls have been poured on the SE corner. Activity has been all in the southeast end of pit so far.
Reply With Quote
     
     
  #59  
Old Posted Feb 4, 2021, 4:53 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,783
Have now poured some of the east and west L2 walls now. Slowly working their way towards the north end of the pit.
Reply With Quote
     
     
  #60  
Old Posted Feb 28, 2021, 3:29 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,783
Very little in the way of progress on the L2 walls and posts.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > London > Projects & Construction Updates
Forum Jump



Forum Jump


All times are GMT. The time now is 10:52 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.