Okay now it gets me wondering. Is it possible for Burnside Connector to change "terminus" on the west side? That's the idea that swimmer_spe got hung up on.
Quote:
Originally Posted by swimmer_spe
NSDOT has the habit of doing it wrong the first time then correcting it later.
|
So it goes like this:
(1) Redo 101, 102 and Bedford Bypass area;
(2) Widen 101 - Bedford Bypass to 6 lanes between Lower Sackville and Bedford;
(3) Tie Burnside Connector to the now widened Bedford Bypass;
(4) Scratch the current western terminus.