HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture


    Salesforce Tower in the SkyscraperPage Database

Building Data Page   • Comparison Diagram   • San Francisco Skyscraper Diagram

Map Location
San Francisco Projects & Construction Forum

Reply

 
Thread Tools Display Modes
     
     
  #3521  
Old Posted Sep 13, 2017, 10:42 AM
Jerry of San Fran's Avatar
Jerry of San Fran Jerry of San Fran is offline
Registered User
 
Join Date: Jun 2007
Location: San Francisco
Posts: 1,552
1977 - Thanks! I got 3 decent pictures out of 600 taken. Link from the image for a couple more photos from the lightning event.
__________________
(Essex) Fox Plaza 52nd year resident in 2023 - (the building everyone loves to hate :------>))
Reply With Quote
     
     
  #3522  
Old Posted Sep 13, 2017, 9:44 PM
botoxic botoxic is offline
Registered User
 
Join Date: Dec 2006
Location: The Mission
Posts: 690
From SFGate/Chronicle - the jury is still out for me

Quote:
Preview of Salesforce sculpture at Hosfelt Gallery

The tallest piece of public art on Earth, a nine-story electronic sculpture in the round by Jim Campbell, is coming to the top of Salesforce Tower.

Its opening keeps getting delayed by construction, and it probably won’t light up the sky until the end of the year, but anxious viewers can see it on a smaller — and closer — scale at Hosfelt Gallery.

“You can get the feel of the presentation that will be on Salesforce at the Hosfelt Gallery,” says Campbell, adding that one can also get a feel for how his art is assembled and how it works in a way that is nearly impossible once installed at Salesforce, where the work will be 61 stories up.



The 10-by-20-foot work is called “Splitting the Crowd,” and it is the centerpiece of “Far Away Up Close,” a solo exhibition of Campbell’s mesmerizing video-based art that opened last weekend. The imagery in “Splitting the Crowd” is not a duplicate, because the Salesforce piece will use live pictures captured around the city each day for broadcast that same night, hence its name “Day for Night.” By contrast, “Splitting the Crowd” uses video that Campbell shot at the Women’s March in Washington in January.

But the technology is the same. Both works use high-definition digital video that is converted to low resolution to reflect an image off a building. Human figures can be seen, but their movements are portrayed in an abstract sea of color, like they are moving through dense San Francisco fog.

At Hosfelt, you can stand at the back of the darkened room and make out the moving humans 80 feet away. Then you can walk toward the art and watch them become more abstract with each step. When you are close enough to touch the metal screen, the art is revealed to be three-dimensional. There are 700 LED lights, each mounted on its own little metal rod so that the light points toward the screen.

This is a hallmark of Campbell’s art. Unlike most video displays, which point the light toward the viewer, Campbell’s work points the light toward the screen, thereby softening the image.



“You are not really seeing the image. You’re seeing a reflection of the image,” says gallery owner Todd Hosfelt, who has represented Campbell for 18 years — which is how long Campbell has been working in LED.

The 700 lights mounted on their little metal stands for “Splitting the Crowd” at Hosfelt Gallery will become 11,000 LED lights mounted on stands to surround Salesforce Tower. In either case, the MIT-educated Campbell has fabricated each and every light in his Dogpatch studio.

“What distinguishes him from anybody else making highly technical work is the fact that Jim is an engineer,” says Hosfelt. “He designs and builds all of his own electronics. It is both really high-tech and handmade.”
http://www.sfgate.com/art/article/Pr...y-12195446.php
Reply With Quote
     
     
  #3523  
Old Posted Sep 17, 2017, 5:00 AM
Jerry of San Fran's Avatar
Jerry of San Fran Jerry of San Fran is offline
Registered User
 
Join Date: Jun 2007
Location: San Francisco
Posts: 1,552
Salesforce 09/16/2017

I've noticed that the top floors the last two nights have not been lit. Apparently work is not happening 24/7 there at those levels.

Salesforce San Francisco Tower - 09/16/2017
__________________
(Essex) Fox Plaza 52nd year resident in 2023 - (the building everyone loves to hate :------>))
Reply With Quote
     
     
  #3524  
Old Posted Sep 18, 2017, 9:45 AM
timbad timbad is offline
heavy user of walkability
 
Join Date: May 2008
Location: Mission Bay, San Francisco
Posts: 3,150
Reply With Quote
     
     
  #3525  
Old Posted Sep 18, 2017, 6:59 PM
fimiak's Avatar
fimiak fimiak is offline
Build Baby Build
 
Join Date: Sep 2010
Location: San Francisco
Posts: 965
Shots from yesterday.




I don't think anyone has mentioned the strange crane sticking out of the West side of the building (viewable on camera). Anyone have more details or thoughts on that?
__________________
San Francisco Projects List ∞ The city that knows how ∞ 2017 ∞ 884,363 ∞ ~2030 ∞ 1,000,000
San Francisco Projects ThreadOakland Projects ThreadOceanwide Center - 275M/901'
Reply With Quote
     
     
  #3526  
Old Posted Sep 20, 2017, 5:22 PM
botoxic botoxic is offline
Registered User
 
Join Date: Dec 2006
Location: The Mission
Posts: 690
^I think that extension may just be a test of the permanent window washing equipment?

For any civil engineers out there, this article is a dream:
1,070-Foot Salesforce Tower Elevates Seismic Design

And for those less geeky, there are still several interesting nuggets:
Quote:

“We were aware of the problems with Millennium Tower and wanted to be sure to avoid anything like that performance,” says Dunn.

After value-engineering, the caissons became 42 load-bearing elements (LBEs) socketed 70 ft into rock. The 10.5-ft x 5-ft LBEs—a first for San Francisco—reach down as deep as 310 ft from grade. They are the city’s deepest foundations, says MKA’s Klemencic.

The LBE work did not go smoothly. Problems with voids and soft tops led to a fix that was a big contributor to a six-month construction delay, says Wilson.
Quote:
PCPA’s scheme called for a 1,200-ft-tall tower, encompassing 1.8 million sq ft. In late 2008, when Hines and TJPA were close to a final agreement but before any documents had been signed, the Great Recession hit, the bottom fell out of the real estate market, and the project was virtually shelved.

“We knew immediately that the price was too high, the timing was too short, and either the design was too expensive or the building was too big,” says Hines’ Paradis.
Quote:
At 61 floors, however, the tower was still 150 ft short of the agreed-upon 1,070-ft height. To compensate, a latticework crown of structural steel was added. By allowing the sun’s rays to pass through it, the crown breaks up shadows. By comparison, in the 1,200-ft scheme, some of the crown’s lower floors would have been occupied, says Paradis.

TJPA on March 26, 2013, transferred the land to the developer at a reduced cost of $190 million, with no funds earmarked for the rooftop park. “The land was a big bargain,” says Switzky.

Schematic design began in 2013. But with no tenant prospects, the developer had a contingency plan to stop construction at grade if the market changed dramatically for the worse, says Hines’ Paradis.

To reach the 920-ft height of the occupied portion, PCPA designed 14-ft, 9-in. floor-to-floor heights, including a raised floor one foot above the structural slab. A raised floor is “somewhat unconventional” for a spec office tower because it adds cost, but it also allows underfloor air distribution, says Clark Bisel, currently senior mechanical consultant for Meyers + Engineers. Bisel designed Salesforce Tower before he left WSP USA, the project’s consulting engineer.

Underfloor air distribution minimizes fan energy and eliminates overhead ductwork. To take advantage of San Francisco’s mild climate, outside air—brought in at each floor through louvers in the curtain wall—is used for ventilation and free cooling much of the time.

Instead of mechanical floors, each level has two mechanical rooms in the core. That avoided big duct risers to distribute air from the mechanical floors but required openings—one for supply air and the other for return air—in the 3-ft-thick core walls.
Quote:

By the time MKA got the CSL test results for the first pile, crews were working on pile six, says Klemencic. The report showed anomalies—changes in density at specific locations in the LBE’s upper 20 to 30 ft.

“That suggests a soft spot—clay or rock in place of concrete,” says Klemencic. The hope was that the data was flawed. “CSL testing is an indication, but it is not necessarily conclusive,” Klemencic adds.

Bencor proceeded with the work, as instructed, says Santarelli. Concurrently, MKA investigated protocols for how to take care of any anomalies.

Soon, crews drilled a 4-in.-dia core in the LBE and sent a camera down. There was a void “the size of a basketball,” says Klemencic.

Additional test data showed consistent anomalies in the LBEs. And further scrutiny of CSL data suggested the LBEs had “soft” tops—1,000-psi concrete, instead of the specified 8,000 psi, adds Klemencic. Ultimately, MKA insisted on remediation for the tops of all 42 LBEs.

The LBEs had been built from grade, with an extra 60 ft at the very top that would be sacrificed during the excavation. Clark decided to excavate the site before the fix, cutting off the sacrificial 60 ft to get closer to the problem tops as much as 90 ft below grade. That meant deepening the excavation and the braced shoring walls to access the 12 LBEs along the perimeter. Clark built a cofferdam around the LBEs in the center of the site so it could isolate and recast the tops.

Klemencic declines to speculate about the cause of the problems. Santarelli blames the voids and the soft tops on the greater rebar congestion near the top, which “prevented the concrete,” installed from the bottom up, from flowing properly. During the fix, crews worked from the top down, which made it easier to deal with the rebar congestion, says Santarelli.

In any case, the fix seems to have worked. To date, the building has performed slightly better than the predicted 11⁄8 in. of settlement, which Klemencic says is from anticipated downward displacement due to axial shortening of the LBEs.

“We have a very extensive monitoring program,” he adds. “The dirt is not moving.

“I’ve said many times that the foundation for Salesforce Tower is probably the best foundation ever built in San Francisco because it’s the only one anyone dug up and looked at,” says Klemencic.
Quote:

And the leasing of the tower has been far more successful than Paradis ever anticipated. “We began the project with no leasing and no leasing prospects,” he says. “Leasing has gone very well.”

In 2014, Salesforce, a cloud computing company, signed a lease for 700,000 sq ft and bought the naming rights. “It was the largest lease in San Francisco history,” says Paradis. Since then, Salesforce has taken an additional 100,000 sq ft, he says.

The building is roughly 90% leased. Negotiations are active with prospective tenants. Paradis says he is “very happy” he didn’t pull the plug during the “depressing” times of the recession.
Source: http://www.enr.com/articles/42725-07...seismic-design
Reply With Quote
     
     
  #3527  
Old Posted Sep 22, 2017, 11:21 PM
Jerry of San Fran's Avatar
Jerry of San Fran Jerry of San Fran is offline
Registered User
 
Join Date: Jun 2007
Location: San Francisco
Posts: 1,552
At Last! 09/22/2017

As of today I can see there is a section on the west side completed all the way to the top of the building! View from my apartment in the Civic Center (with a telephoto lens).

Salesforce San Francisco
__________________
(Essex) Fox Plaza 52nd year resident in 2023 - (the building everyone loves to hate :------>))
Reply With Quote
     
     
  #3528  
Old Posted Sep 22, 2017, 11:40 PM
Jerry of San Fran's Avatar
Jerry of San Fran Jerry of San Fran is offline
Registered User
 
Join Date: Jun 2007
Location: San Francisco
Posts: 1,552
Window Washer Platforms 09/22/2017

fimiak - I noticed the 2 cranes today. I've seen these on other high-rise buildings & yes they are for the window washers. I can see 2 of them from my view in the Civic Center. (photo taken with a telephoto lens)

Salesforce San Francisco
__________________
(Essex) Fox Plaza 52nd year resident in 2023 - (the building everyone loves to hate :------>))
Reply With Quote
     
     
  #3529  
Old Posted Sep 22, 2017, 11:46 PM
Pedestrian's Avatar
Pedestrian Pedestrian is offline
Registered User
 
Join Date: Dec 2016
Location: San Francisco
Posts: 24,177
Quote:
Originally Posted by botoxic View Post
For any civil engineers out there, this article is a dream:
1,070-Foot Salesforce Tower Elevates Seismic Design
Fantastic post--thanks a bunch.
Reply With Quote
     
     
  #3530  
Old Posted Sep 24, 2017, 6:10 PM
Sun Belt Sun Belt is offline
BANNED
 
Join Date: Sep 2017
Location: The Envy of the World
Posts: 4,926
What's great about SF tower is that it compliments the Trans America building. It doesn't steal the show entirely. 2 iconic towers in the city.
Reply With Quote
     
     
  #3531  
Old Posted Sep 24, 2017, 6:26 PM
Pedestrian's Avatar
Pedestrian Pedestrian is offline
Registered User
 
Join Date: Dec 2016
Location: San Francisco
Posts: 24,177
Quote:
Originally Posted by Jerry of San Fran View Post
fimiak - I noticed the 2 cranes today. I've seen these on other high-rise buildings & yes they are for the window washers. I can see 2 of them from my view in the Civic Center. (photo taken with a telephoto lens)

Salesforce San Francisco
What's with the brown stain? Hope it's not rust already. looks like they may need to do a quick spray painting job before it's even finished.
Reply With Quote
     
     
  #3532  
Old Posted Sep 24, 2017, 6:48 PM
Jerry of San Fran's Avatar
Jerry of San Fran Jerry of San Fran is offline
Registered User
 
Join Date: Jun 2007
Location: San Francisco
Posts: 1,552
Sunday 09/24/2017

The skin is nearly completely in place on the west side except for a vertical sliver.

Yes, it is curious why a section has a rust color to it.

Telephoto view from my apartment.

Salesforce San Francisco
__________________
(Essex) Fox Plaza 52nd year resident in 2023 - (the building everyone loves to hate :------>))
Reply With Quote
     
     
  #3533  
Old Posted Sep 25, 2017, 2:45 PM
donnie's Avatar
donnie donnie is offline
Registered User
 
Join Date: Feb 2011
Posts: 596
As a Chicagoan i can appreciate a beautiful skyline when i see one and San Fran is top 5 and climbing!
Reply With Quote
     
     
  #3534  
Old Posted Sep 25, 2017, 5:49 PM
botoxic botoxic is offline
Registered User
 
Join Date: Dec 2006
Location: The Mission
Posts: 690
It's funny - prior to construction, various renderings left people wondering if Salesforce Tower would be blue, white, silver, or even purple. Now that it is built, we can see that under differing conditions, almost all are valid. I wish 181 were shown completely in this photo - the play of sunlight on the slight surface angles looks to produce some intriguing sunrise and sunset effects.


Market Street view from Twin Peak, San Francisco, CA by Kevin Wang, on Flickr
Reply With Quote
     
     
  #3535  
Old Posted Sep 25, 2017, 5:55 PM
fimiak's Avatar
fimiak fimiak is offline
Build Baby Build
 
Join Date: Sep 2010
Location: San Francisco
Posts: 965
Just imagine Oceanwide in the morning. Also the Gang tower at 100 Folsom. Even 400 Folsom will be amazing.

donnie...many think San Francisco sits comfortably at #3 skyline in the US, although it definitely is in a struggle against LA, Miami, and Seattle for this.

__________________
San Francisco Projects List ∞ The city that knows how ∞ 2017 ∞ 884,363 ∞ ~2030 ∞ 1,000,000
San Francisco Projects ThreadOakland Projects ThreadOceanwide Center - 275M/901'
Reply With Quote
     
     
  #3536  
Old Posted Sep 25, 2017, 9:05 PM
timbad timbad is offline
heavy user of walkability
 
Join Date: May 2008
Location: Mission Bay, San Francisco
Posts: 3,150


Reply With Quote
     
     
  #3537  
Old Posted Sep 26, 2017, 4:04 AM
181Fremont 181Fremont is offline
Registered User
 
Join Date: Oct 2016
Location: California
Posts: 18
Hope the Salesforce Tower will be able to light up in time for Halloween.

Quote:
The panels are going up now, but the completed artwork will not be displayed until the fall.
http://www.ktvu.com/news/art-install...lesforce-tower
Reply With Quote
     
     
  #3538  
Old Posted Sep 27, 2017, 7:55 PM
Jerry of San Fran's Avatar
Jerry of San Fran Jerry of San Fran is offline
Registered User
 
Join Date: Jun 2007
Location: San Francisco
Posts: 1,552
West Side is Now Complete

Except for 4 windows, the west side is complete! I am happy to see the finished building in my view now. It is impressive.

Salesforce San Francisco
__________________
(Essex) Fox Plaza 52nd year resident in 2023 - (the building everyone loves to hate :------>))
Reply With Quote
     
     
  #3539  
Old Posted Sep 27, 2017, 8:24 PM
ozone's Avatar
ozone ozone is offline
Registered User
 
Join Date: May 2004
Location: Sacramento California
Posts: 2,270
^^^ Sweet! So many of the current "supertalls" are so fussy looking. This is an elegant and timeless skyscraper. Btw did anyone figure out what the discoloration (in the crown) is all about?
Reply With Quote
     
     
  #3540  
Old Posted Sep 28, 2017, 12:06 AM
fimiak's Avatar
fimiak fimiak is offline
Build Baby Build
 
Join Date: Sep 2010
Location: San Francisco
Posts: 965
Quote:
Originally Posted by ozone View Post
^^^ Sweet! So many of the current "supertalls" are so fussy looking. This is an elegant and timeless skyscraper. Btw did anyone figure out what the discoloration (in the crown) is all about?
A few weeks back I noticed a discoloration on some of the North side panels that appears to have been washed away when we had rain. I am hoping the same will happen again next time we have a good shower.
__________________
San Francisco Projects List ∞ The city that knows how ∞ 2017 ∞ 884,363 ∞ ~2030 ∞ 1,000,000
San Francisco Projects ThreadOakland Projects ThreadOceanwide Center - 275M/901'
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 12:43 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.