I last posted an update here 11 days ago on April 7th. since then, tons of things have happened. Here is a rundown...
APRIL 8TH
4101 Manchester began construction on April 8th. This will be a 7-floor building with retail, parking, office and residential space and will be built at Manchester-Sarah-Chouteau in the Grove.
STATUS
Kansas City-based Abbott properties are eyeing 4 building renovations in the Downtown area. Their addresses are
2008 Olive
2657 Washington
1917 Delmar
1909 Locust
No timeline are cost was given.
STORY: https://www.cityscene-stl.com/news/k...-midtown-alley
Renderings...
APRIL 9th
The new design of the $1.7 Billion Next NGA West was revealed. California based Gensler is doing the design work on the project. Construction will begin next summer and wrap up in 2025. McCarthy-HITT is doing the construction.
STORY: https://www.cityscene-stl.com/news/n...-west-unveiled
Renderings...
APRIL 10TH
The 11-floor Ballpark Village office building (known as the PwC Pennant Building) topped out. Dignitaries announced that Clayton based asset management firm BurcherJospeh & Co. would move to the PwC Pennant Building and occupy roughly 8000SF.
STORY: https://www.cityscene-stl.com/news/b...seph-as-tenant
Photos of the final beam being hoisted up and the dignitaries
APRIL 15th
One of the last abandoned buildings Downtown, the Chemical Building at 8th and Olive, is under contract to be bought by Restoration St. Louis. The firm did Hotel Saint Louis next door in the 705 Olive Building. The Chemical will at 84 Hotel rooms, 72 apartments, a ballroom, rooftop bar and a new restaurant to Downtown in a $54 Million renovation. The large red building has been the site of numerous faield bids to redevelop it over the years.
STORY: https://www.cityscene-stl.com/news/r...mical-building
Photos of the building...
APRIL 17th
CHROMA Phase 2 was unveiled. The $11 Million project will add 54 apartments (17 studio and 37 one bedroom) and a small retail space tot he Grove. this building will be built with the existing CHROMA project that completely reshaped the eastern entrance into the Grove. This small building will be built at Papin and Sarah. VE Design group is the architect and Koman+Green Street is the developer. Construction should begin this May.
STORY: https://www.cityscene-stl.com/news/c...ase-2-unveiled
Rendering and site plan...