HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Discussion Forums > Transportation


Reply

 
Thread Tools Display Modes
     
     
  #701  
Old Posted Jul 13, 2021, 2:20 PM
202_Cyclist's Avatar
202_Cyclist 202_Cyclist is offline
Registered User
 
Join Date: Feb 2009
Posts: 5,941
Well, at least the DC area isn't the only metropolitan region with a Silver line train to the airport that will be delayed....

Why DART is pushing back the opening date for the Silver Line to DFW Airport


By Chloe Bennett
Jul 12, 2021
Dallas Morning News

"The opening of the long-anticipated Dallas Area Rapid Transit Silver Line has been pushed back again and will now open two years after it was initially set to begin carrying passengers between Dallas/Fort Worth Airport and Plano.

Before the COVID-19 pandemic hit North Texas, the line was scheduled to open in 2022 but has now been pushed back twice due to construction delays and unsettled agreements..."

https://www.dallasnews.com/news/tran...o-dfw-airport/
Reply With Quote
     
     
  #702  
Old Posted Aug 1, 2021, 11:02 PM
Nite's Avatar
Nite Nite is offline
Registered User
 
Join Date: Dec 2007
Location: Toronto
Posts: 2,992
All of Toronto's new transits projects in one video

Video Link
Reply With Quote
     
     
  #703  
Old Posted Aug 6, 2021, 5:41 PM
Ifactwo Ifactwo is offline
Registered User
 
Join Date: Sep 2017
Posts: 65
Why are construction or improvements focusses on major cities? It would be nice also to give attention on some provinces. However, thumbs up for the continuing projects.
Reply With Quote
     
     
  #704  
Old Posted Sep 15, 2021, 12:34 PM
Innsertnamehere's Avatar
Innsertnamehere Innsertnamehere is online now
Registered User
 
Join Date: Jan 2010
Location: Hamilton
Posts: 11,595
GO transit is extending service from Kitchener to London in October using existing infrastructure. This is a significant extension of the existing line - 95 km / 57 miles, but it comes in the form of a single morning and evening rush hour train that will take about 4 hours to make the trip.

This is considered a first phase, with efforts to improve frequency and travel times likely to occur later. The train would use a corridor which is in very poor shape. The corridor between Kitchener and Toronto was purchased by Metrolinx about a decade ago and is finally seeing some significant upgrades to increase train speeds, I imagine Metrolinx will now purchase the remainder of the corridor and make similar upgrades. Even the upgrades already underway on the existing corridor should make significant differences on travel times.

https://lfpress.com/news/local-news/...-go-for-london

This seems to be GO's expansion model - start with a slow train with limited frequency and slowly upgrade speeds and frequencies to a more complete service. This has occurred on the Kitchener extension since 2012 when it first opened with existing infrastructure and only two peak hour trains, evolving into a faster service with much higher frequencies, and is also already underway on the Niagara extension which opened in 2019 with a similarly terrible travel time but with plans to make large improvements.
Reply With Quote
     
     
  #705  
Old Posted Oct 3, 2021, 3:19 PM
Tcmetro Tcmetro is offline
Registered User
 
Join Date: Jul 2010
Posts: 105
A few recent openings:

There's only a few more happening this year.

SEPTA's Line 15 trolley was scheduled to reopen in Fall 2021 along with the Port Richmond extension, but I've yet to see any news on the progress of the refurbishment of the vehicles. Here's an article from March 2021 showing the testing underway: https://phillyyimby.com/2021/03/trol...ladelphia.html

Also, there's the aforementioned GO Transit extension to London, using VIA tracks and stations. That will start on Oct. 18, 2021: https://www.trains.com/trn/news-revi...ondon-ontario/

Honolulu's HART was said in the beginning of the year that it would open by the end of 2021, but I haven't been able to find any recent news that confirms that it would open.

Milwaukee's HOP streetcar is supposed to open it's second branch by Summer 2022, or its federal grant could be recalled. The tower that will host the final stop of the line is now under construction, and the developer will be obligated to pay the grant back if the line can't open by then. https://urbanmilwaukee.com/2021/05/0...egins-may-5th/

Scheduled for 2022:
Reply With Quote
     
     
  #706  
Old Posted Oct 21, 2021, 1:25 PM
Prahaboheme Prahaboheme is offline
Registered User
 
Join Date: Apr 2003
Posts: 1,690
Should the Washington metro Potomac Yard station on the Yellow and Blue lines be included in this list?
Reply With Quote
     
     
  #707  
Old Posted Oct 21, 2021, 3:40 PM
Innsertnamehere's Avatar
Innsertnamehere Innsertnamehere is online now
Registered User
 
Join Date: Jan 2010
Location: Hamilton
Posts: 11,595
The Toronto Eglinton Crosstown West Extension has quietly started construction with the advanced contract for the tunnels beginning this summer.



https://www.metrolinxengage.com/site...3_ecwe_voh.pdf

Toronto Eglinton Crosstown West - 5.7 miles (9.2 km)


The construction so far involves the excavation of the tunnel launch shaft at the future Renforth Station. the TBMs are expected to be launched in the spring to begin the dig eastwards through the planned underground portion of the line.

A future connection is planned to Pearson International Airport, bringing TTC rapid transit service to the airport for the first time, subject to the design of a planned rapid transit hub at the airport. The line also brings TTC rapid transit to Mississauga for the first time, with Renforth station lying just on the opposite side of the City of Toronto border with Mississauga. The line will be entirely grade seperated.

The line is not expected to be opened until 2030.
Reply With Quote
     
     
  #708  
Old Posted Oct 26, 2021, 6:59 PM
Obadno Obadno is offline
Registered User
 
Join Date: Jan 2010
Posts: 6,608
Phoenix Light Rail update

Phoenix Metro has quite a bit of train expansion beyond the street car above I thought I would Detail



Northwest Extension

Northwest Extension is not particularly long but it is connecting the old(now closed) Metro-center Mall (Of Bill & Ted fame), the entire mall is working on a redevelopment plan as many malls have to convert into new office/retail/apartment space. Particularly exciting as its the first elevated station in the system (outside of the airport train).







South Central Extension

Already under construction for over a year this is a 5 mile extension that also includes a new central hub as now the light rail will have multiple lines instead of one long line.



Former Central station will hopefully become this but they seem to be falling through right now:






Tempe Street car (connects to light rail) Under construction:









The Airport Sky Train expansion

Connects to the light rail, all terminals and Remote parking, is now connecting to the Rental Car center, also they are going to build an Airport Hotel that will connect to the Skytrain and maybe commuter rail :



Completed Stations, endpoint built right into rental car center (Hopefully they make that landscaping nicer !!!)





Commuter Rail/Brightline/ Amtrak

And lastly the long term potential plan to build commuter rail and inter-city between Phoenix and Tucson and LA. Basic plans have been finalized but it isnt funded and not a state priority at the moment. Maybe some day:

Yellow Route was chosen



Additionally Amtrak is planning to bring Amtrak service back to Phoenix which would reopen our long dead City station, as well as Brightline planning to extend its service to Phoenix after the LA-Vegas line is completed which would likely also come into the central station and link up with the entire system, commuter, airport, light rail etc.

https://www.azcentral.com/story/news...ts/7065082002/

https://twitter.com/GoBrightline?ref...Ctwgr%5Eauthor

Last edited by Obadno; Oct 26, 2021 at 7:21 PM.
Reply With Quote
     
     
  #709  
Old Posted Oct 29, 2021, 9:13 PM
plutonicpanda plutonicpanda is offline
Registered User
 
Join Date: Apr 2013
Location: Los Angeles
Posts: 623
I mean good for those that want alternatives to cars but I really can not understand why at grade rail, basically glorified streetcars, are chosen over BRT with dedicated lanes, signal priority, and dedicated ROW.
Reply With Quote
     
     
  #710  
Old Posted Nov 1, 2021, 7:17 PM
Obadno Obadno is offline
Registered User
 
Join Date: Jan 2010
Posts: 6,608
Quote:
Originally Posted by plutonicpanda View Post
I mean good for those that want alternatives to cars but I really can not understand why at grade rail, basically glorified streetcars, are chosen over BRT with dedicated lanes, signal priority, and dedicated ROW.
BRT just hasnt captured the public or city planners like rail has. But Phoenix is working on a BRT line if its successful you will see more:

https://www.phoenix.gov/publictransit/brt



Long term BRT vision for the city:


A local reditor has compiled all of the transit plans for 2040 if theyall pan out, Commuter, Light Rail, Street Car BRT etc.

https://www.reddit.com/r/phoenix/com...sit_proposals/
Reply With Quote
     
     
  #711  
Old Posted Nov 10, 2021, 12:13 PM
202_Cyclist's Avatar
202_Cyclist 202_Cyclist is offline
Registered User
 
Join Date: Feb 2009
Posts: 5,941
Tampa targets streetcar expansion for infrastructure bill funds

By Lloyd Sowers
November 9, 2021

"TAMPA, Fla. - While some drivers would like to see every penny spent on new and bigger roads, Tampa’s mayor says we need to change our view of mass transit.

"Mass transit in the south is more than two people in an SUV," said Mayor Jane Castor. "We have to get people used to riding the bus, to riding the streetcar and seeing that as a very reliable and safe mode of transportation."

The mayor invited a group of transportation leaders for a day that included a ride on Tampa’s historic streetcar. Among her guests was the state transportation secretary who will have a say on how Florida’s federal infrastructure dollars will be divided..."

https://www.fox13news.com/news/tampa...ure-bill-funds
Reply With Quote
     
     
  #712  
Old Posted Nov 18, 2021, 11:01 PM
SAN Man SAN Man is offline
BANNED
 
Join Date: Nov 2021
Location: San Diego, California
Posts: 725
San Diego's Mid Coast Trolley Extension opens on Sunday, 11/21/21! And yes, I plan on being there to take some pictures and hopefully post here.



$2.1 billion, 11 miles, 9 new stations, servicing and connecting UCSD, University Town Center to Downtown and the rest of the Trolley network. It will be an extension of the existing Blue Line which currently ends at the San Ysidro international border crossing and was one of the first light rail lines constructed in the modern era.

New Map here:
https://www.sdmts.com/inside-mts-cur...lley-extension
Reply With Quote
     
     
  #713  
Old Posted Nov 20, 2021, 9:33 PM
SAN Man SAN Man is offline
BANNED
 
Join Date: Nov 2021
Location: San Diego, California
Posts: 725
I stopped by one of the new Trolley stations and snapped a picture of the Trolley map effective tomorrow. The light shaded blue route on the upper left side of the map is the extension that's opening tomorrow.

Trolley Map by Sanchez.M, on Flickr
Reply With Quote
     
     
  #714  
Old Posted Nov 21, 2021, 10:05 PM
SAN Man SAN Man is offline
BANNED
 
Join Date: Nov 2021
Location: San Diego, California
Posts: 725
San Diego's Mid-Coast/Blue Line extension is officially open! I took a couple pictures from some platforms, I didn't get a chance to take any onboard, it was too crowded.


Trolley arriving UTC station.
UTC trolley by Manuel Sanchez, on Flickr


Looking north from UTC station.
UTC north by Manuel Sanchez, on Flickr


The viaduct, looking north from UTC, down on Genesee.
Genesee by Manuel Sanchez, on Flickr

Looking north from Balboa platform.
North from Balboa by Manuel Sanchez, on Flickr
[/QUOTE]
Reply With Quote
     
     
  #715  
Old Posted Nov 22, 2021, 4:13 AM
Cirrus's Avatar
Cirrus Cirrus is online now
cities|transit|croissants
 
Join Date: Jul 2001
Location: Washington, DC
Posts: 18,384
Congrats San Diego! Boy that 2020 & 2021 list is sparse.
__________________
writing | twitter | flickr | instagram | ssp photo threads
Reply With Quote
     
     
  #716  
Old Posted Nov 22, 2021, 5:48 AM
OhioGuy OhioGuy is offline
Registered User
 
Join Date: Jul 2004
Location: DC
Posts: 7,652
Quote:
Originally Posted by Cirrus View Post
Congrats San Diego! Boy that 2020 & 2021 list is sparse.
A good extension for San Diego!

As for the 2020 & 2021 list, you could add Seattle's Northgate Link extension to the 2021 list, though that only makes it three instead of two... still very sparse!
Reply With Quote
     
     
  #717  
Old Posted Nov 22, 2021, 3:10 PM
Busy Bee's Avatar
Busy Bee Busy Bee is online now
Show me the blueprints
 
Join Date: Feb 2006
Location: on the artistic spectrum
Posts: 10,372
Those red LRVs look great rolling over this extension.
__________________
Everything new is old again

There is no goodness in him, and his power to convince people otherwise is beyond understanding
Reply With Quote
     
     
  #718  
Old Posted Nov 22, 2021, 6:17 PM
Cirrus's Avatar
Cirrus Cirrus is online now
cities|transit|croissants
 
Join Date: Jul 2001
Location: Washington, DC
Posts: 18,384
Seattle Northgate moved to complete
__________________
writing | twitter | flickr | instagram | ssp photo threads
Reply With Quote
     
     
  #719  
Old Posted Nov 23, 2021, 3:16 PM
Innsertnamehere's Avatar
Innsertnamehere Innsertnamehere is online now
Registered User
 
Join Date: Jan 2010
Location: Hamilton
Posts: 11,595
Preliminary works have quietly begun for Toronto's Ontario Line in the past month, starting with preliminary grading works along the Lakeshore East Rail Corridor. The Ontario line will run along this corridor at the surface, adjacent to 4 GO tracks for GO RER service.

The preliminary works will replace several bridges along the shared corridor and raise the grade of the corridor by several metres to improve bridge clear heights for the underpasses.

Further preliminary works at Exhibition Station on the west end of the line are expected to begin in the next few months.

Full construction of the primary construction contract is expected to begin by Fall 2022.

Toronto Ontario Line - 10 miles (16 km)

https://blog.metrolinx.com/2021/11/2...o-bowmanville/





More information on the project is available here:

https://www.metrolinx.com/en/greater...ario-line.aspx
Reply With Quote
     
     
  #720  
Old Posted Nov 23, 2021, 3:28 PM
Innsertnamehere's Avatar
Innsertnamehere Innsertnamehere is online now
Registered User
 
Join Date: Jan 2010
Location: Hamilton
Posts: 11,595
an update on the Eglinton West LRT Extension with some photos of construction. The Tunnel Boring launch shafts have been dug over the summer. TBMs are expected to launch in the spring, and are currently in the process of being shipped from Germany where they were manufactured.

The line will initially run from the terminus of the Crosstown LRT at Mount Dennis (due to open next year) to Renforth Station in Mississauga, however it is intended to eventually run to Pearson Airport. It will be fully grade seperated and functionally operate as a metro line.

Toronto Eglinton West LRT - 6 miles (9km)



https://blog.metrolinx.com/2021/07/1...est-extension/

Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Discussion Forums > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 7:43 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.